Laura H. Carnell School

Laura H. Carnell School

1100 Devereaux Ave.
Philadelphia, PA 19111

Planning Phase

No projects are currently in this phase

Design Phase

No projects are currently in this phase

Construction Phase

Construction Budget: $19.1 MM

BOE Approval Date:

Scope of Work: GESA 1 Energy Conservation Measures include Domestic water upgrades and building envelope repair. Mechanical and Electrical installation in all areas. Electrical and control installation. Abatement work as well as  VCT tiles installed throughout. New Electrical (PECO) and Gas Services (PGW) access lines; demolition and removal of old equipment; New Chiller installation; New hallway cabinet units and classroom ceiling units,’ Dual-temperature piping work in the original building; New Broiler installation; Demolition and replacement of an emergency generator system.

Construction Phase

Complete

Classroom Modernization

Construction Budget: $ $1,615,870

BOE Approval Date: 04/22/21

Scope of work: Modernization of specified classrooms and installation of new furnishings and technology. Modernization of classrooms to include replacement of movable partitions with infill walls; Wall and ceiling repainting; Ceiling and door replacement; New casework, cubbies, and built-in shelving; Refurbished and new classroom teaching boards.; Install new lighting, clocks, power, data receptacles, and conduit pathways;  Classroom sink and toilet replacement; Heating valve and trap replacement; Hydration Station replacement; New window AC units; VCT floor replacement and Hardwood floor refinishing; All new classroom furnishings and new interactive Panelboards; Slate chalkboards and cork bulletin boards will be replaced with magnetic white marker boards and tack boards.

Classroom Modernization

Construction Budget: $610,000

BOE Approval Date: 4/22/21

Modernization of specified classrooms and installation of new furnishings and technology. Modernization of classrooms to include replacement of movable partitions with infill walls; Wall and ceiling repainting; Ceiling and door replacement; New casework, cubbies, and built-in shelving; Refurbished and new classroom teaching boards.; Install new lighting, clocks, power, data receptacles, and conduit pathways;  Classroom sink and toilet replacement; Heating valve and trap replacement; Hydration Station replacement; New window AC units; VCT floor replacement and Hardwood floor refinishing; All new classroom furnishings and new interactive Panelboards; Slate chalkboards and cork bulletin boards will be replaced with magnetic white marker boards and tack boards.