Active Project (s): GESA3 Energy Efficiency Upgrades
The GESA program will focus on the following Energy Conservation Measures (ECMs): Automatic Temperature Controls (ATC) upgrades and repairs to allow improved comfort; levels and reduce energy consumption.; New boilers and chillers to improve cooling and new terminal units for heating and ventilation.; Steam to hot water heating conversions; New Air Handling Units (AHUs) for improved heating and ventilation.; Electrical System upgrades as needed; seal the envelope of buildings to reduce heat loss
Budget: $ 11,563,317 MM
BOE Approval: 12/15/22
Status: Design Phase
Anticipated Completion Date: 9/30/24