Ethan Allen Elementary School
Ethan Allen is undergoing a major renovation and receiving a three-story, 38,000 SF building addition that includes 13 classrooms, two bathrooms, an elevator, and a gymnasium. The new addition is structurally isolated from the existing building and allows access between buildings via transition stairs. The addition is a steel-framed structure supporting elevated concrete floors on a composite metal deck. The substructure is a reinforced concrete shallow foundation system. Additional scope includes renovations/upgrades to the existing systems, classrooms, and exterior envelope.
Budget: $19.2 MM
BOE Approval Date: 8/20/2020
Status: Under Construction
Recently Completed Project(s)
Asbestos Abatement
Abatement Budget: $193,029
BOE Approval Date: 5/28/20
Scope of Work: Abatement work in preparation for construction projects underway