Grover Washington Middle School
Grades: 5-8
Active Project (s): Energy Performance Improvements; Storm Water Management System Installation
The GESA program will focus on the following Energy Conservation Measures (ECMs): LED light fixtures and controls: Installation of high-efficiency LED lighting fixtures to both the interior and exterior; Automatic Temperature Controls (ATC) upgrades and repairs to allow improved comfort; levels and reduce energy consumption.; New boilers and chillers to improve cooling and new terminal units for heating and ventilation.; Steam to hot water heating conversions; New Air Handling Units (AHUs) for improved heating and ventilation.; Electrical System upgrades as needed; seal the envelope of buildings to reduce heat loss
Construction Budget: $12,465,569 MM
BOE Approval Date: 12/16/22
Status: Design Phase
Anticipated Completion: 9/30/24
Storm Water Management Project
Construction Budget: $
BOE Approval Date:
Status: Design Phase
Anticipated Completion: 9/30/24