9/14/2022 | RFP - Thomas Holme Elementary School | 10/18/2022 | 2 pm | 10/22/2022 | 2 pm | RFP - Thomas Holme Elementary School
Walkthrough Sign In Sheet
Walkthrough Sign in Sheet 2 | Click here for access to all addenda | capitalbids@philasd.org | |
7/22/22 | RFP - 072222 PREQUALIFICATION SERVICES FOR PROFESSIONAL SERVICES FIRMS AND
CONSTRUCTION COMPANIES | 9/9/22 | 2 pm | 8/22/22 | 2 pm | RFP - 072222 PREQUALIFICATION SERVICES FOR PROFESSIONAL SERVICES FIRMS AND CONSTRUCTION COMPANIES
Sample Contract | Addendum1
Addendum2 | Daniel Sadwick | |
7/15/22 | RFP - TURNKEY AMY at James Martin | 9/15/22 | N/A | N/A | N/A | RFP - TURNKEY AMY at James Martin
Walkthrough Sign in Sheets | Please Click Here for all Addenda | Daniel Sadwick | |
06/09/22 | RFP - 060922 Professional Estimating and Scheduling Services | 08/30/2022 | 12 p.m. | 07/22/22 | 4 p.m. | RFP - 060922 Professional Estimating and Scheduling Services
Sample Contract | Addendum1
Addendum2 | Daniel Sadwick | |
05/27/22 | RFP - Cassidy School CM at Risk | 07/07/2022 | N/A | N/A | N/A | RFP - Cassidy School CM at Risk
Walkthrough Sign in Sheet
Sign in Sheet 2 | For access to all Addenda please click This Link | Daniel Sadwick | |
02/14 | GESA - 3 | 03/04/2022 | 2 p.m. | 02/24/22 | 2 p.m. | RFP-021422 Guaranteed Energy Savings Act (GESA) Contract Inclusive of Energy Efficient Building Upgrades (GESA-3)
Pre-proposal conference Video Call: February 16th , 2022 at 9:00 AM
Zoom Link
Meeting ID: 879 9548 4660
Passcode: 856318
Attachments and Appendix Link
Kickoff Meeting Attendees:
List 1
List 2
Walkthrough Sign In Sheet | Addendum1 | Daniel Sadwick | |
08/06 | Various Schools | 09/03/21 | 5 p.m. | 08/24/21 | 2 p.m. | RFQ-080621 Professional Moving Services
Sample Contract
There will be two walkthroughs on August 13th. The first at 9 am at Hopkinson School and the second at 11 am at Ethan Allen School. | Addendum1 | Jesse Jones | Awarded Firms |
06/17 | SDP | 09/17/21 | 2 p.m. | 09/08/21 | 2 p.m. | RFP-071721 Request For Proposals And Qualifications To Provide Professional Architectural Services On An As-Needed Basis
Sample Contract | Addendum1
Addendum2
Addendum3 | Jesse Jones | Awarded Firms |
05/17 | SDP | 06/10/21 | 2 p.m. | 05/28/21 | 10 a.m. | RFP-051721 Professional Supplemental Staffing On An As-Needed Basis
Attachments A-G
Sample Contract | Addendum1 | Jesse Jones | Awarded Firms |
04/05 | SDP | 05/07/21 | 2 p.m. | 04/20/21 | 2 p.m. | RFP-040521 Material Testing and Special Inspection Services
Sample Contract
Attachment A | Addendum1
| Jesse Jones | Awarded Firms |
03/30/21 | Philadelphia Energy Authority | 04/30/21 | 3 p.m. | 04/16/21 | 3 p.m. | PEA – Three Requests for Proposals (RFPs) for Frankford High School Solar Lab: (1) HVAC; (2) Electrical; and (3) Window installation | | info@philaenergy.org | |
02/04 | JH Brown School Bethune School
Beeber School | 03/08/21 | 2 p.m. | 02/19/21 | 2 p.m. | RFP-020421 Guaranteed Energy Savings Act (GESA) ContractInclusive of Energy Efficient Building Upgrades
Sample Contract | Addendum1
Drawings | Jesse Jones | Awarded Firms |
12/18 | SDP | 01/26/21 | 3 p.m. | 01/14/21 | 3 p.m. | RFP121820 - 2020 Commissioning Report
Sample Contract
| Addendum1 | Jesse Jones | Awarded Firms |
11/24 | SDP | 12/22/20 | 3 p.m. | 12/07/20 | 3 p.m. | RFP112420 - Mechanical, Plumbing, Fire Protection and Electrical Engineering Design Services on an As-Needed Basis
Sample Contract | Addendum1
Addendum2 | Jesse Jones | Awarded Firms |
08/25 | Hamilton Disston Elementary School
Walkthrough Sign in Sheet | 09/18/20 | 2 p.m. | 09/02/20 | 3 p.m. | Major Renovations and Addition
Appendix A
Appendix B
Appendix C
Appendix D
Sample Contract
Revised Fee Proposal | Addendum1 | Jesse Jones | |
04/13 | Lewis C. Cassidy Elementary School
Plan Holders List | 05/12/20 | 3 p.m. | 05/01/20 | 3 p.m. | Request a Debrief
RFP-041320 New Lewis C. Cassidy Elementary School
Appendix A
Appendix B
Appendix C
Appendix D
Sample Contract | Addendum1
Addendum2 | Jesse Jones | Awarded Firm |
02/07 | SDP | 03/03/20 | 5 p.m. | 02/19/20 | 2 p.m. | RFP-020720 Reproduction Services
Sample Contract | Addendum1 | Jesse Jones | Awarded Firms |
01/24 | Thomas M. Pierce School
Walkthrough Sign-In-Sheet | 02/18/20 | 5 p.m. | 02/05/20 | 5 p.m. | RFP-012420 New T.M. Peirce Elementary School
Walk-throughs of the Project Site for Proposers are scheduled for Thursday, January 30, 2020 at 9:00
AM at the following location:
Thomas M. Peirce ES
2300 W. Cambria,
Philadelphia, PA 19132
Appendix A
Appendix B
Appendix C
Appendix D
Sample Contract | Addendum1
Addendum2 | Jesse Jones | Awarded Firm |
12/23 | SDP | 03/31/20 | 2 p.m. | 03/24/20 | 2 p.m. | RFQ: Paint and Plaster Rolling Submissions
Sample Contract 1
Sample Contract 2 | | Jesse Jones | |
12/03 | SDP | 12/20/19 | 2 p.m. | 12/9/19 | 2 p.m. | RFP-638 Program Management
A MANDATORY Vendor Conference will be held at the following location on December
10th, 2019 at 10 am in room 3049
Sample Contract
PLA
Pre-Proposal Sign in Sheet
Fee Proposal Template | Addendum1
Addendum2 | Jesse Jones | Awarded Firm |
11/15 | SDP | 12/13/19 | 3 p.m. | 12/02/19 | 10 a.m. | RFP-19101 - Professional Asbestos, Lead and Mold Consulting Services
Sample Contract | Addendum1
Addendum2 | Jesse Jones | |
09/23 | SDP | 10/23/19 | 2 p.m. | 10/14/19 | 2 p.m. | RFP-19004 Professional Estimating and Scheduling Services
Sample Contract | Addendum1
Addendum2 | Jesse Jones | |
09/23 | Various Schools | 10/24/19 | 2 p.m. | 10/15/19 | 2 p.m. | RFQ-19100 Professional Moving Services
Sample Contract
There will be two walkthroughs on September 27th. The first at 9 am at Ethan Allen School and the second at 11 am at Richmond School. | | Jesse Jones | Awarded Firm |
09/11 | SDP | 12/31/19 | 2 p.m. | | | RFQ: Paint and Plaster Rolling Submissions
Sample Contract Part 1
Sample Contract Part 2 | | Jesse Jones | |
08/30 | SDP | 10/01/19 | 2 p.m. | 09/13/19 | 2 p.m. | RFP: Professional Architectural Design Services On an As-Needed Basis
Sample Contract | Addendum1
Addendum2 | Jesse Jones | Awarded Firms |
08/30 | Rhawnhurst Elementary School
Walkthrough Sign-In Sheet | 10/01/19 | 2 p.m. | 09/17/19 | 2 p.m. | RFP: Addition and Major Renovation
Sample Contract
Exhibit A: Scope Determination Report
Exhibit B: FCA
Exhibit C: Drawings
Exhibit D: Drawings
Exhibit E: AHERA | Addendum1
Addendum2 | Jesse Jones | Awarded Firm |
08/30 | Elkins Elementary School
Walkthrough Sign-In Sheet | 10/01/19 | 2 p.m. | 09/17/19 | 2 p.m. | RFP: Major HVAC Renovations
Sample Contract
Exhibit A: Scope Determination Report
Exhibit B: FCA
Exhibit C: Existing Drawings
Exhibit D: Elkin ES 2018-2019 AHERA Location Log Report | Addendum1 | Jesse Jones | Awarded Firm |
07/10 | SDP | 07/30/19 | 2 p.m. | 07/19/19 | 2 p.m. | Educational Specifications, Design Guidelines and Standards
Sample Contract | Addendum1
Addendum2 | Jesse Jones | Awarded Firm |
05/31 | Vare Washington Elementary School | 07/11/19 | 3 p.m. | 07/2/19 | 2 p.m. | RFP: Major HVAC Renovations
Sample Contract
Exhibit A: Scope Determination Report (Part 1)
Exhibit A: Scope Determination Report (Part 2)
Exhibit B: FCA Report
Exhibit C: Vare Washington Drawings
Walk-though Sign in Sheet | Addendum1
Addendum2 | Jesse Jones | Awarded Firms |
05/20 | SDP | 06/18/19 | 2 p.m. | 05/31/19 | 2 p.m. | Civil Landscape Architecture RFP
Sample Contract | Addendum1
Addendum2 | Jesse Jones | Awarded Firms |
05/17 | Kensington High School | 06/17/19 | 2 p.m. | 06/03/19 | 3 p.m. | RFP: Building Envelope Renovation
Sample Contract | Addendum1 | Jesse Jones | Awarded Firms |
05/14 | SDP | 06/04/19 | 3 p.m. | 05/28/19 | 3 p.m. | RFP: Comprehensive School Portfolio Review
Sample Contract | Addendum1
Addendum2 | Jesse Jones | Awarded Firms |
02/05 | SDP | 03/01/19 | 2 p.m. | 02/22/19 | 2 p.m. | RFQ: Paint and Plaster Rolling Submissions
Sample Contract Part 1
Sample Contract Part 2 | Addendum3 | Jesse Jones | Awarded Firms |
12/27 | SDP | 01/31/19 | 2 p.m. | 01/17/19 | 10 a.m. | RFP: Supplemental Staffing
Attachments A-G
Sample Contract | Addendum1 | Jesse Jones | Awarded Firms |
12/21 | Hartranft
01.04.18 Walkthrough Sign-in-Sheet | 01/31/19 | 2 p.m. | 01/11/19 | 2 p.m. | RFP: HVAC Major Renovation Project
Exhibit A: Scope Determination Report
Exhibit B: FCA Report
Exhibit C: Existing Drawings
Sample Contract | Addendum1 | Jesse Jones | Awarded Firms |
12/19 | SDP | 02/01/19 | 2 p.m. | 12/28/18 | 2 p.m. | RFQ: Paint & Plaster Repairs Rolling Submissions | | Jesse Jones | |
11/19 | F. S. Edmonds
12.04.18 Walkthrough Sign-in Sheet | 12/28/18 | 2 p.m. | 12/18/18 | 2 p.m. | RFP: Major HVAC Renovations
Exhibit A: Scope Determination Report
Exhibit B: Facility Condition Assessment
Exhibit C: Existing Drawings; Part 2; Part 3
Exhibit D: Sample Contract | Addendum1 | Jesse Jones | Awarded Firms |
11/02 | GESA
GESA1 11.17.18 Survey Attendees
12.01.18 Sign-in Sheet | 12/21/18 | 2 p.m. | 12/7/18 | 2 p.m. | RFP: GESA Contract Inclusive of Energy Efficient Building Upgrades
Attachment 1: Scope of Engineering Services
Attachment 2: Scope of Construction Services
Attachments 3-7
Appendix A: Contracting Law
Appendix B: Facility Profile List
Appendix C: Sample Contract
Appendix D: Scoring Form
Appendix E: Energy Consumption Data
Appendix F: FCA Reports
Appendix G: Survey Site Data
Appendix H: AHERA Reports
Appendix I: Floor Plans-Drawings
Appendix J: Water Consumption Data
Appendix K: Partnership Agreement
Appendix L: Lincoln BAS Workstation
Appendix M: Gompers Lighting Specifications
Performance Payment Materialmens Bonds
Public Works Contractors Bond Law | Addendum1
Addendum2
Addendum3
Addendum4
Addendum5
Addendum6 | Jesse Jones | Awarded Firms |
10/26 | James Rhoads | 11/27/18 | 2 p.m. | 11/16 | 2 p.m. | RFP: Professional Architectural & Engineering
Exhibit A: Scope Determination Report
Sample Contract
Walkthrough Sign-in Sheet 11.09.18 | Addendum1 | Jesse Jones | Awarded Firms |
10/19 | Anne Frank | 11/20/18 | 2 p.m. | 11/07 | 2 p.m. | RFP: Addition and Renovation
Attachment A: Sample Contract
Exhibit A: Scope Determination Report
Exhibit B: Facility Condition Assessment
Exhibit C: Cost Estimate
Walkthrough Sign-in Sheet
Exhibit D: Existing Drawings
Walkthrough Sign-in Sheet 11-13-18 | Addendum1 | Jesse Jones | Awarded Firms |
09/24 | | 10/30/18 | 3 p.m. | 10/09 | 3 p.m. | RFP: Comprehensive Demographic Study of Northeast Philadelphia
Attachment A: Sample Contract | Addendum1
Addendum2
Addendum3 | Jesse Jones | Awarded Firms |
09/21 | | 10/25/18 | 10 a.m. | 10/18 | 2 p.m. | RFP: Paint and Plaster Repairs
Sample Contract Part 1
Sample Contract Part 2 | Addendum1
Addendum2 | Jesse Jones | Awarded Firms |
09/18 | | 10/10/18 | 2 p.m. | 09/26 | 2 p.m. | RFP: Facade Inspection Services
Sample Contract | Addendum1 | Jesse Jones | Awarded Firms |
09/12 | 9/21/18 Walkthrough Attendance List
9/28/18 Walkthrough Attendance List
10/05/18 Walkthrough Attendance List | 10/16/18 | 3 p.m. | 10/08 | 3 p.m. | RFP: Turnkey Development of New K-8 School
Attachment A: Pre-Development Agreement Sample
Appendix A: Program of Requirements
Appendix B: Site Survey
Appendix C: Standards
Appendix D: Phases and Deliverables
Appendix E: Cost Estimate Requirements | Addendum1
Addendum2
Addendum3
Addendum4 | Jesse Jones | Awarded Firms |
07/30 | | 08/21/18 | 2 p.m. | 08/10 | 2 p.m. | RFP: Structural Engineering Design Services
Sample Contract
| Addendum1 | Jesse Jones | Awarded Firms |
05/17 | Cook-Wissahickon
Sign-In Sheet | 06/22/18 | 2 p.m. | 06/11 | 2 p.m. | RFP: Engineering Design Services for Major HVAC Renovations
Sample Contract
Exhibit A: Scope Determination Report
Exhibit B: Facility Condition Assessment
Exhibit C: Drawings | Addendum1 | Jerry Thompson | Awarded Firms |
05/14 | Hamilton | 06/01/18 | 2 p.m. | 05/23 | 2 p.m. | RFP: Architectural Design Services for Major Renovation
Sample Contract
Exhibit A: Scope Determination Report
Exhibit B: Facility Condition Assessment
Exhibit C: Cost Estimate Summary
Exhibit D: Drawings Part 1; Drawings Part 2 | Addendum1 | Jerry Thompson | Awarded Firms |
04/24 | Swenson HS | 05/25/18 | 2 p.m. | 05/11 | 2 p.m. | RFP: Architectural Design Services for CTE Improvements
Sample Contract
Exhibit A: Scope Determination Report
Exhibit B: Facility Condition Assessment
Exhibit C: Cost Estimate Summary | Addendum 1 | Jerry Thompson | Awarded Firms |
04/16 | Richmond
Sign-In Sheet | 05/15/18 | 2 p.m. | 04/30 | 2 p.m. | RFP: Architectural Design Services for Major Renovation & Addition
Sample Contract
Scope Determination Report
Facility Condition Assessment
Drawings
| Addendum 1
Addendum 2 | Jerry Thompson | Awarded Firms |
04/09 | Randolph
Sign-In Sheet | 05/08/18 | 2 p.m. | 04/27 | 2 p.m. | RFP: Architectural Design Services for CTE Improvements
Sample Contract
Scope Determination Report
Facility Condition Assessment | | Jerry Thompson | Awarded Firms |
04/06 | SDP | 04/30/18 | 3 p.m. | 04/20 | 10 a.m. | RFP: Environmental and Safety Medical Services
Sample Contract | Addendum 1 | Francine Locke | Awarded Firms |
03/28 | Ethan Allen | 04/30/18 | 2 p.m. | 04/20 | 2 p.m. | RFP: Architectural Design Services - Major Renovation & Addition
Sample Contract
Drawings Part 1; Drawings Part 2; Drawings Part 3
Exhibit A: Scope Determination Report
Exhibit B: Site Assessment Report
Exhibit C: Construction Assessment | Addendum 1 | Jerry Thompson | Awarded Firms |
03/28 | Thurgood Marshall | 05/01/18 | 2 p.m. | 04/24 | 2 p.m. | RFP: Retro Commissioning at Thurgood Marshall ES
Sample Contract
Drawings; Drawings 2; Plumbing Drawings | Addendum 1 | Jerry Thompson | Awarded Firms |
03/28 | SDP | 04/27/18 | 3 p.m. | 04/17 | 10 a.m. | RFP: Environmental Consulting for Indoor Air Quality, Air Emissions & Radon
Sample Contract | Addendum 1 | Francine Locke | Awarded Firms |
03/28 | SDP | 04/30/18 | 3 p.m. | 04/13 | 3 p.m. | RFP: Environmental Consulting for Hazardous Materials & Waste Management
Sample Contract | Addendum 1 | Francine Locke | Awarded Firms |
03/28 | SDP | 04/23/18 | 3 p.m. | 04/09 | 10 a.m. | RFP: Environmental Consulting for Geotechnical & Environmental Site Assessments
Sample Contract | Addendum 1 | Francine Locke | Awarded Firms |
03/26 | John Barry
Sign-In Sheet | 04/24/18 | 2 p.m. | 04/17 | 2 p.m. | RFP: Professional Engineering Services for Retro Commissioning
Sample Contract; Revised Contract
Mechanical Drawings; Electrical Drawings; Plumbing Drawings; Other Drawings | Addendum 1 | Jerry Thompson | Awarded Firms |
03/08 | SDP | 03/30/18 | 3 p.m. | 03/19 | 10 a.m. | RFP: Professional Environmental and Safety Training Consulting Services
Sample Contract | | Francine Locke | Awarded Firms |
12/16 | SDP | 03/01/18 | 3 p.m. | 02/23 | 10 a.m. | RFP: Environmental Consulting for Asbestos, Lead & Analytical Lab
Sample Contract | Addendum 1 | Francine Locke | |
12/07 | SDP | 01/16/18 | | 01/03 | 2 p.m. | RFP: Water Testing Management Services
Water Fountain Data
Sample Contract | Addendum 1 | Jerry Thompson | Awarded Firms |
10/05 | SDP
Sign-In Sheet | 12/01/17 | | 11/17 | 3 p.m. | RFP: (GESA) Contract Inclusive of Energy Efficient Building Upgrades
Northeast HS Sched. for Replaced Steam Caps
Saul HS Mechanical Plant Replacement
Contract
Utility Data
Security Clearance
PA Background Checks Statutes
MWBE Outreach Attendees | Addendum 1
Addendum 2
Addendum 3
Addendum 4 | Jerry Thompson | Awarded Firms |
09/15 | SDP | 10/11/17 | 2 p.m. | 09/27 | 2 p.m. | RFP: Facade Inspections
Sample Contract | Addendum 1 | Jerry Thompson | Awarded Firms |
07/17 | Ben Franklin | 08/02/17 | 2 p.m. | 07/24 | 2 p.m. | RFP: Professional Architectural Services for Benjamin Franklin HS Major Renovation
Floor Plans
Ideal Classroom
Sample Contract (Revised 7.20.17) | Addendum 1
Addendum 2 | Jerry Thompson | Awarded Firms |
06/23 | SDP | 07/25/17 | 2 p.m. | 07/14 | 2 p.m. | RFP: Material Testing Services On An As-Needed Basis
Attachment A
Sample Contract | Addendum 1 | Jerry Thompson | Awarded Firms |
06/09 | SDP | 07/25/17 | 2 p.m. | 07/14 | 2 p.m. | RFP: Mechanical, Plumbing, Fire Protection & Electrical Design Services As-Needed
Sample Contract | Addendum 1 | Jerry Thompson | Awarded Firms |
06/09 | SDP | 07/11/17 | 2 p.m. | 06/30 | 2 p.m. | RFP to Provide Roofing Analysis and Roofing Design Services On An As-Needed Basis
Sample Contract | | Gerald Thompson | Awarded Firms |
03/27 | Energy Pilot | 04/25/17 | 2 p.m. | 04/07 | 10 a.m. | Professional Energy Performance Engineering (EPE) Services
Sample Contract and Insurance Requirements | | Francine Locke
Jerry Junod | |
02/10 | Solis Cohen
Sign-In Sheet
Sign-In Sheet | 03/21/17 | 2 p.m. | 03/10 | 3 p.m. | RFP: Professional Architectural Services for New Solomon Solis Cohen Elementary School
Solis Cohen Existing Drawings
Sample Contract | Addendum 1 | Gerald Thompson | Awarded Firms |
01/26 | Solis Cohen
Sign-In Sheet | 02/16/17 | 3 p.m. | 02/09 | 3 p.m. | RFP: Professional Construction Management Services for A New Replacement School at Solis Cohen
Sample CM Contract | Addendum 1 | Gerald Thompson | Awarded Firms |
11/23 | John Kinsey | 01/12/17 | 2 p.m. | 12/12 | 2 p.m. | RFP: Professional Construction Management Services at John L. Kinsey ES
Sample CM Contract, Sample Construction Contract
Bond Forms
Attachment A: Sample Agreement
REVISED Attachment: E
Attachment F: Floor Plans and Elevations of Existing Building
Attachment G: Program of Requirements
Attachment H: Wireless Access Point Requirements
Attachment I: 3 Year AHERA Report
Attachment J: Environmental Coordination
Attachment K: List of Asbestos, Lead and Mold Consulting Firms | Addendum 1
Addendum 2
Addendum 3 | Gerald Thompson | |
11/29 | SDP | 12/13/16 | 2 p.m. | 12/08 | 2 p.m. | RFQ: Professional Moving Services On an As-Needed Basis Throughout the District
Sample Contract | Addendum 1 | Gerald Thompson | |
02/10 | SDP | 03/21/17 | 2 p.m. | 03/10 | 3 p.m. | RFP/RFQ: Professional Architectural Design Services on an As-Needed Basis
Attachment A: Request for Qualifications (May take a couple of minutes to open)
Sample Professional Design Services Contract | Addendum 1
Addendum 2
Addendum 3 | Gerald Thompson | |
06/06 | Greenfield | 08/12/16 | 2 p.m. | 08/02 | 10 a.m. | RFP: Professional Design Services for Major Renovation at Albert Greenfield ES
Attachment A: Request for Qualifications (May take a couple of minutes to open)
Drawings referenced in RFP
Sample Professional Design Services Contract | Addendum 1
Addendum 2
Addendum 3
Addendum 4
Addendum 5
Addendum 6 | Gerald Thompson | |
03/25 | SDP | 06/17/16 | 2 p.m. | 06/07 | 10 a.m. | RFP: Professional Structural Design Services
Sample Professional Structural Design Services Contract | | Gerald Thompson | |
03/25 | SDP | 04/22/16 | 2 p.m. | 04/14 | 2 p.m. | RFP: Professional Supplemental Staffing On An As-Needed Basis
Exhibit C: Standard Terms and Conditions
Sample Professional Supplemental Staffing Contract | Addendum 1 | Gerald Thompson | |
Posted Date | Project | Due Date | Due Time | Q&A
Deadline | Deadline Time | Request for Proposal | Addendum | Contact
Person | Firms |
| | | | | | | | | |
| | | | | | | | | |