Science Leadership Academy at Beeber

5925 Malvern Ave, 19131

Grades: 9-12

Active Project (s): School Yard Renovation ; Exterior Door Replacements; Energy Efficiency Upgrades

 

Schoolyard Improvements

Budget: $TBD

BOE Approval Date: TBD

Status: Design Phase

Replacement of all Exterior Doors

Budget: $372,944

BOE Approval Date: TBD

Status: Design Phase

Energy Savings Upgrades (GESA-2) The GESA program will focus on the following Energy Conservation Measures (ECMs): LED light fixtures and controls: Installation of high-efficiency LED lighting fixtures to both the interior and exterior; Automatic Temperature Control (ATC) upgrades and repairs to allow improved comfort levels and reduce energy consumption; New boilers and chillers, to improve cooling and new terminal units for heating and ventilation; Steam to hot water heating conversions; New Air Handling Units (AHU’s) for improved heating and ventilation; Electrical System upgrades as needed; Seal envelope of buildings to reduce heat loss.

Budget: $17,942,440

Board Approval Date: May 27, 2021

Status: Construction Phase

 

Construction Phase

Recently Completed

Science Lab Renovations

Budget: $1,022,864

Board Approval Date: June 24, 2021

Status: Construction Complete

Scope of Work: Complete demolition and replacement of two science labs on the 1 st and 2 nd floors.
Painting, lighting, ceilings, flooring, and workstation replacements
New furniture and fume hood installation

Bathroom Renovations

Budget: $3,117,900

Board Approval Date: January 28, 2021

Status: Construction Complete

Scope of Work: All Student and staff bathrooms are abated and renovated with new flooring and wall tiles, doors & partitions. Basement locker rooms added ADA ramp, railings, lockers, bathroom & shower panels, epoxy flooring, painting, toilets, urinals & sinks, hot water pumps, sewer tanks & motors, fire/smoke dampers, FA system, exhaust fans, light fixtures. This includes a TOTAL – of 55 water closets, 13 urinals, 32 lavatories & 12 showers