Philadelphia High School for Girls

1400 W Olney Ave, 19141

Grades: 9-12

Active Project (s): Storm Water Management System, Electrical Upgrades

Storm Water Management System Installation to include repaving walkways, and schoolyard areas, and new seating areas

Budget: $ 2.4 MM

BOE Approval Date: TBD

Status: In design

Replacement and upgrade of the existing electrical power distribution system; with two new dual-ended 3000-ampere 208/120-volt substations, panelboards, 60 kW emergency generator, automatic transfer switch, and roll-up temporary generator connection box. The new fire alarm system consists of speaker strobes, strobes, heat, smoke detectors, pull stations, remote test stations, and a new front-end panel with voice capability and remote annunciators. Providing two 24000 BTU window air conditioning units per classroom area with custom-made metal brackets, two 30000 BTU split systems for each substation room with programmable thermostats and condensate pumps. Additional power receptacles in classrooms and new doors and hardware.

Project Cost: $5,557,700

BOE Approval Date: 9/23/21

Status: Construction Phase

Construction Phase 54%

Recently Completed

Science Lab Renovations

General Contract Budget: $425,000
Mechanical Contract Budget:$$225,000
Mechanical Contract Budget:$77,000
Electrical Contract Budget: $$117,125

BOE Approval Date: 2/28/19

Scope of Work: Science Lab Renovations