Philadelphia High School for Girls
Grades: 9-12
Active Project (s): Storm Water Management System, Electrical Upgrades
Storm Water Management System Installation to include repaving walkways, and schoolyard areas, and new seating areas
Budget: $ 2.4 MM
BOE Approval Date: TBD
Status: In design
Replacement and upgrade of the existing electrical power distribution system; with two new dual-ended 3000-ampere 208/120-volt substations, panelboards, 60 kW emergency generator, automatic transfer switch, and roll-up temporary generator connection box. The new fire alarm system consists of speaker strobes, strobes, heat, smoke detectors, pull stations, remote test stations, and a new front-end panel with voice capability and remote annunciators. Providing two 24000 BTU window air conditioning units per classroom area with custom-made metal brackets, two 30000 BTU split systems for each substation room with programmable thermostats and condensate pumps. Additional power receptacles in classrooms and new doors and hardware.
Project Cost: $5,557,700
BOE Approval Date: 9/23/21
Status: Construction Phase
Science Lab Renovations
General Contract Budget: $425,000
Mechanical Contract Budget:$$225,000
Mechanical Contract Budget:$77,000
Electrical Contract Budget: $$117,125
BOE Approval Date: 2/28/19
Scope of Work: Science Lab Renovations
Last modified: January 13, 2023