3/23/23: Procurement Bid Opening Zoom weblink – https://philasd-org.zoom.us/j/87007978710?pwd=eHlRZVJEY0lpc0VxcGlMMFZRbWZrUT09
2/23/23: Note please go to the Procurement website to see newer capital bid projects.
Look for negotiation numbers offered by the program office – office of capital programs.
Capital Bids
Posted Date | Due Date | Specification # | Contract | Description | Addenda | Location | Budget | Results |
---|---|---|---|---|---|---|---|---|
9/19/22 | 10/18/22 | 2022-013-G | General | PARKING LOT RECONSTRUCTION AND STORMWATER MANAGEMENT IMPROVEMENTS AT ANDREW HAMILTON SCHOOL A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, SEPTEMBER 29, 2022 AT 10:00 AM Zoom Link to bid opening | Addendum1 | Andrew Hamilton School | - | Bid Results |
8/22/22 | 9/15/22 | 2022-125-E | Electrical | Fire Alarm System Replacement at Belmont Charter School A SITE VISIT HAS BEEN SCHEDULED FOR WEDNESDAY, AUGUST 31, 2022 AT 10:00 AM Walkthrough Sign in Sheet Zoom Link to bid opening | Addendum1 Addendum2 Addendum3 | Belmont Charter School | - | Bid Results |
8/10/22 | 9/8/22 | 2022-039-E | Electrical | Fire Alarm and Generator Replacement at Northeast High School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, AUGUST 23, 2022 AT 10:00 AM Zoom Link to bid opening | Addendum1 Addendum2 Addendum3 | Northeast High School | - | Bid Results |
7/20/22 | 9/8/22 | B-029C of 2020/21 | Electrical | Electrical Upgrades at George W. Nebinger School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, JULY 26, 2022 AT 10:00 AM A PRE BID MEETING/SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM, ON WEDNESDAY, AUGUST 17, 2022 Zoom link to the bid opening | Addendum1 Addendum2 Addendum3 | George W. Nebinger School | - | Bid Results Plan Holders List |
7/1/22 | 8/4/22 | 2022-014-G | General | Envelope Repairs at Spring Garden Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, JULY 14 2022 AT 10:00 AM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Spring Garden Elementary School | $3,834,132 | Plan Holders List Bid Results |
7/1/22 | 8/2/22 | 2022-122-G | General | Exterior Renovations at Feltonville Intermediate School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, JULY 19 2022 AT 10:00 AM Walkthrough Sign in Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 | Feltonville Intermediate School | $7,659,051 | Plan Holders List Bid Results |
6/29/2022 | 7/28/22 | B-055C of 2020/21 | Electrical | Fire Alarm System Replacement At Paul Robeson High School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, JUlY 7, 2022 AT 10:00 AM Zoom Link for Bid Opening | Addendum1 | Paul Robeson High School | $252,111 | Plan Holders List Bid Results |
06/09/22 | 08/12/2022 | RFP - 060922 Professional Estimating and Scheduling Services | Professional Services | RFP - 060922 Professional Estimating and Scheduling Services | Addendum1 | Various | N/A | |
5/6/22 | 6/14/22 | B-013C of 2020/21 | General | Window Replacement at Ellwood Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, MAY 19, 2022 AT 10:00 AM Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | Ellwood Elementary School | $1,685,676 | Plan Holders List Bid Results |
5/4/22 | 5/19/22 | 2022-080-G | General | PARKING LOT AND RAMP RENOVATIONS AT SAMUEL POWEL SCHOOL A SITE VISIT HAS BEEN SCHEDULED FOR MAY 11, 2022 AT 2:00 PM Zoom Link for Bid Opening | Addendum1 | SAMUEL POWEL SCHOOL | $249,818 | Plan Holders List Bid Results |
4/12/22 | 5/17/22 | 2022-124-G | General | Major Renovation and Addition at Robert Pollock Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY APRIL 19, 2022 AT 10:30 AM Per the City of Philadelphia, Masks will be required while indoors beginning April 18th, 2022 A pre-bid walkthrough at the site is scheduled for 4/26/2022 at noon. Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 Addendum6 Addendum7 Addendum8 | Robert Pollock Elementary School | $8,896,777 | Bid Results |
2022-124-M | Mechanical | $4,441,172 | Bid Results | |||||
2022-124-P | Plumbing | $1,287,185 | Bid Results | |||||
2022-124-E | Electrical | $3,840,916 | Bid Results | |||||
4//6/22 | 5/12/22 | B-057C of 2020/21 | General | Major Renovations at Edwin Forrest School A SITE VISIT HAS BEEN SCHEDULED FOR MONDAY APRIL 11, 2022 AT 1:30 PM Walkthrough Sign in Sheet PRE-BID SITE VISIT #2 scheduled for Monday, April 25, 2022 at 2:30 PM Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | Edwin Forrest School | $7,370,479 | Bid Results |
B-058C of 2020/21 | Mechanical | $4,874,378 | Bid Results | |||||
B-059C of 2020/21 | Plumbing | $843,321 | Bid Results | |||||
B-060C of 2020/21 | Electrical | $2,775,500 | Bid Results | |||||
4/14/22 | 5/5/22 | B-066 C OF 2020/21 | General | Schoolyard Improvements at Joseph Pennell School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, APRIL 21, 2022 AT 2:00 PM Per the City of Philadelphia, Masks will be required while indoors beginning April 18th, 2022 Zoom Link for Bid Opening | Addendum1 | Joseph Pennell School | $726,000 | Bid Results |
4/11/22 | 5/5/22 | 2022-004-G (R) | General | SITE IMPROVEMENTS (REBID) at G. W. CHILDS SCHOOL A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, APRIL 19, 2021 AT 10:30 AM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 | G.W. Childs School | $347,120 | Bid Results |
3/15/22 | 4/5/22 | B-054C of 2020/21 | Electrical | Fire Alarm Replacement at Horace Furness High School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, MARCH 22, 2022 AT 10:00 AM Zoom Link For Bid Opening | Horace Furness High School | $620,330 | Plan Holders List Bid Results |
|
2/10/22 | 3/29/22 | 2022-018-G | General | Major HVAC Renovation at Potter Thomas School SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON FEBRUARY 17, 2022 Walkthrough Sign in Sheet Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 | Potter Thomas School | $316,119 | Bid Results Plan Holders List |
2/10/22 | 2022-018-M | Mechanical | $4,678,252 | Bid Results | ||||
2/10/22 | 2022-018-E | Electrical | $762,061 | Bid Results | ||||
2/10/22 | 2022-018-P | Plumbing | $169,114 | Bid Results | ||||
2/22/22 | 3/17/22 | B-035 C of 2019/20 | General | Playground, Pavement & Stormwater Management at Anne Lane Lingelbach School PREBID MEETING/SITE VISIT: 10:00 am, MARCH 2, 2022 Zoom Link For Bid Opening | Addendum1 | Anne Lane Lingelbach School | $1,653,252 | Bid Results Plan Holders List |
1/24/22 | 3/3/22 | 2022-010-G | General | Classroom Modernization at John Patterson School SITE VISIT HAS BEEN SCHEDULED FOR 1:30 PM ON JANUARY 28, 2022 Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 Addendum3 | John Patterson School | $1,528,053 | Bid Results |
1/24/22 | 3/3/22 | 2022-010-E | Electrical | $392,260 | Bid Results | |||
1/24/22 | 3/3/22 | 2022-010-P | Plumbing | $176,124 | Bid Results | |||
1/24/22 | 3/3/22 | 2022-009-G | General | Classroom Modernization at Delaplaine McDaniel School SITE VISIT HAS BEEN SCHEDULED FOR 11:30 AM ON JANUARY 28, 2022 Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 Addendum3 Addendum4 | Delaplaine McDaniel School | $511,724 | Bid Results |
1/24/22 | 3/3/22 | 2022-009-E | Electrical | $130,371 | Bid Results | |||
1/24/22 | 3/3/22 | 2022-008-G | General | Classroom Modernization at Joseph Catharine School SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON JANUARY 28, 2022 Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 Addendum3 | Joseph Catharine School | $1,010,631 | Bid Results |
1/24/22 | 3/3/22 | 2022-008-E | Electrical | $455,855 | Bid Results | |||
1/24/22 | 3/3/22 | 2022-008-P | Plumbing | $114,838 | Bid Results | |||
1/28/22 | 3/1/22 | 2022-001-G | General | Classroom Modernization at General Phillip Kearny School SITE VISIT HAS BEEN SCHEDULED FOR 11:30 AM ON February 3, 2022 Walkthrough Sign-in Sheet A site visit to be held on Thursday, February 17, 2022 at 12:30 p.m. Zoom Link For Bid | Addendum1 Addendum2revised Addendum3 | General Phillip Kearny School | $577,236 | Plan Holders List Bid Results |
1/28/22 | 3/1/22 | 2022-001-E | Electrical | $375,828 | Bid Results | |||
1/28/22 | 3/1/22 | 2022-002-G | General | Classroom Modernization at William Kelley School SITE VISIT HAS BEEN SCHEDULED FOR 9:30 AM on February 3, 2022 Walkthrough Sign-in Sheet A site visit to be held on Thursday, February 17, 2022 at 10:00 a.m. Zoom Link For Bid | Addendum1 Addendum2 Addendum3 | William Kelley School | $597,018 | Plan Holders List Bid Results |
1/28/22 | 3/1/22 | 2022-002-E | Electrical | $250,299 | Bid Results | |||
1/28/22 | 3/1/22 | 2022-003-G | General | Classroom Modernization at Martha Washington School SITE VISIT HAS BEEN SCHEDULED FOR 1:30 PM on February 3, 2022 Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 Addendum3 | Martha Washington School | $513,499 | Bid Results |
1/28/22 | 3/1/22 | 2022-003-E | Electrical | $324,321 | Bid Results | |||
1/21/22 | 2/22/22 | 2022-005-G | General | Classroom Modernization at Benjamin Franklin School SITE VISIT HAS BEEN SCHEDULED FOR 12:45 PM ON JANUARY 31, 2022 Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 | Benjamin Franklin School | $935,569 | Plan Holders List Bid Results |
1/21/22 | 2/22/22 | 2022-005-E | Electrical | $241,644 | Bid Results | |||
1/21/22 | 2/22/22 | 2022-006-G | General | Classroom Modernization at Francis Hopkinson School SITE VISIT HAS BEEN SCHEDULED FOR 11:30 AM ON JANUARY 31, 2022 Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 | Francis Hopkinson School | $1,202,834 | Bid Results |
1/21/22 | 2/22/22 | 2022-006-E | Electrical | $367,639 | Bid Results | |||
1/21/22 | 2/22/22 | 2022-006-P | Plumbing | $227,867 | Bid Results | |||
1/21/22 | 2/22/22 | 2022-007-G | General | Classroom Modernization at Henry Lawton School SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON JANUARY 31, 2022 Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 | Henry Lawton School | $1,679,330 | Bid Results |
1/21/22 | 2/22/22 | 2022-007-E | Electrical | $544,940 | Bid Results | |||
1/21/22 | 2/22/22 | 2022-007-P | Plumbing | $142,256 | Bid Results | |||
12/14/2021 | 02/17/2022 | B-117 C of 2017/18 | General | ROOF REPLACEMENT AT BAYARD TAYLOR ELEMENTARY SCHOOL PRE-BID MEETING/SITE VISIT: 10:00 AM, THURSDAY, JANUARY 13, 2022. Zoom Link For Bid | Addendum1 Addendum2 | BAYARD TAYLOR ELEMENTARY SCHOOL | $1,483,054 | Plan Holders List Bid Results |
12/10/2021 | 02/15/2022 | B-027 C of 2020/21 | Electrical | ELECTRICAL UPGRADES AT W.C. BRYANT SCHOOL PRE-BID MEETING/SITE VISIT: 10:00 AM, WEDNESDAY, DECEMBER 22, 2021. Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1revised Addendum2 Addendum3 Addendum4 | W.C. BRYANT SCHOOL | $5,172,926 | Plan Holders List Bid Results |
12/21/2021 | 02/10/2022 | B-089 C of 2018/19 | General | MAJOR HVAC RENOVATIONS AT RR WRIGHT ELEMENTARY SCHOOL. PRE-BID MEETING/SITE VISIT: 10:00 AM, THURSDAY, JANUARY 6, 2022. Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 Addendum3 Addendum4 | RICHARD R. WRIGHT ELEMENTARY SCHOOL | $354,163 | Plan Holders List Bid Results |
B-079 C of 2018/19 | Mechanical | $3,732,188 | Bid Results | |||||
B-090 C of 2018/19 | Plumbing | $146,028 | Bid Results | |||||
B-080 C of 2018/19 | Electrical | $984,198 | Bid Results | |||||
11/29/021 | 01/11/2022 | B-065 C of 2020/21 | General | SCHOOLYARD IMPROVEMENTS AT LOUIS H. FARRELL SCHOOL PRE-BID MEETING/SITE VISIT: 10:00 AM, THURSDAY, DECEMBER 9, 2021. Zoom Link For Bid | Addendum1 Addendum2 | LOUIS H. FARRELL SCHOOL | $977,953 | Plan Holders List Bid Results |
11/24/2021 | 12/21/2021 | B-070 C (R) of 2019/20 | General | MAJOR ADDITION AND RENOVATIONS AT RHAWNHURST ELEMENTARY SCHOOL PRE-BID MEETING/SITE VISIT: 10:00 AM, FRIDAY, DECEMBER 3, 2021. Walkthrough Sign-In Sheet Zoom Link For Bid | Addendum1 Addendum2 | RHAWNHURST ELEMENTARY SCHOOL | $12,822,669 | Bid Results Plan Holders List |
B-071 C (R) of 2019/20 | Mechanical | $ 3,647,342 | Bid Results | |||||
B-072 C (R) of 2019/20 | Plumbing | $1,734,071 | Bid Results | |||||
B-073 C (R) of 2019/20 | Electrical | $4,839, 559 | Bid Results | |||||
11/15/21 | 12/14/21 | B-085 C of 2019/20 | General | Major HVAC Renovation at Vare-Washington Elementary School PRE-BID MEETING/SITE VISIT: 1:30 PM, MONDAY, NOVEMBER 22, 2021. Walkthrough Sign-In Sheet Zoom Link for Bid | Addendum1 Addendum2 | Vare Washington | $463,317 | Bid Results Plan Holders List |
B-086 C of 2019/20 | Mechanical | $3,736,178 | Bid Results | |||||
B-087 C of 2019/20 | Plumbing | $484,656 | Bid Results | |||||
B-088 C of 2019/20 | Electrical | $536,644 | Bid Results | |||||
11/8 | 12/02/21 | B-001 C OF 2022/23 | General | NEW CLASSROOM ADDITION AT MAYFAIR ELEMENTARY SCHOOL SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON TUESDAY, NOVEMBER 16, 2021 Walkthrough Sign-In Sheet Zoom Link for Bid | Addendum1 Addendum2 Addendum3 | MAYFAIR ELEMENTARY SCHOOL | $3,844,337 | Bid Results Plan Holders List |
B-002 C OF 2022/23 | Mechanical | $785,539 | Bid Results | |||||
B-003 C OF 2022/23 | Plumbing | $442,869 | Bid Results | |||||
B-004 C OF 2022/23 | Electrical | $524,089 | Bid Results | |||||
10/28 | 11/30/21 | B-014 C of 2019/20 | General | STRUCTURAL REPAIR PROJECT AT ROBERT MORRIS ELEMENTARY SCHOOL A SITE VISIT HAS BEEN SCHEDULED FOR WEDNESDAY, NOVEMBER 10, 2021 AT 10:00 AM. Walkthrough Sign-In Sheet Zoom Link For Bid | Addendum1 | ROBERT MORRIS ELEMENTARY SCHOOL | $587,502 | Bid Results Plan Holders List |
10/29 | 11/23/21 | B-049 C of 2020/21 | Electrical | GENERATOR REPLACEMENT & FIRE ALARM SYSTEM EXTENSION AT STEPHEN DECATUR SCHOOL A SITE VISIT HAS BEEN SCHEDULED FOR WEDNESDAY, NOVEMBER 10, 2021 AT 10:00 AM. Walkthrough Sign-In Sheet Zoom Link For Bid | Addendum1 | STEPHEN DECATUR SCHOOL | $288,941 | Bid Results Plan Holders List |
10/08 | 11/09/21 | B-061 C of 2018/19 | General | Building Envelope Renovation at John F. Hartranft Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR WEDNESDAY, OCTOBER 20 2021 AT 1:00 PM Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 | John F. Hartranft Elementary School | $1,885,230 | Bid Results Plan Holders List |
10/01 | 11/4/21 | 2022-004-G | General | SITE IMPROVEMENTS at G. W. CHILDS SCHOOL A SITE VISIT HAS BEEN SCHEDULED FOR OCTOBER 13, 2021 AT 1:00 PM Walkthrough Sign in Sheet Zoom Link For Bid | Addendum1 | G.W. Childs School | $221,131 | Bid Results Plan Holders List |
10/13 | 11/02/21 | B-030C of 2020/21 | General | SITE IMPROVEMENTS at MCMICHAEL SCHOOL PREBID MEETING/SITE VISIT: 10:00 AM, WEDNESDAY, OCTOBER 20,2021. Zoom Link For Bid | Addendum1 | Morton McMichael School | $293,604 | Plan Holders List Bid Results |
08/13 | 10/21/21 | B-001 C of 2021 /22 | General | TOILET ROOM RENOVATIONS SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON FRIDAY, AUGUST 20, 2021 Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 Addendum6 | JAMES LOGAN SCHOOL 1700 LINDLEY AVENUE | $2,062,066 | Bid Results Plan Holders List |
B-002 C of 2021/22 | Mechanical | $160,803 | Bid Results | |||||
B-003 C of 2021/22 | Plumbing | $604,790 | Bid Results | |||||
B-004 C of 2021/22 | Electrical | $154,971 | Bid Results | |||||
09/21 | 10/12/21 | B-016C of 2020/21 | Electrical | Fire Alarm Replacement at Feltonville Intermediate School A SITE VISIT HAS BEEN SCHEDULED FOR SEPTEMBER 29TH, 2021 AT 10:00 AM Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 | FELTONVILLE INTERMEDIATE SCHOOL | $281,309 | Bid Results |
09/10 | 10/12/21 | B-026C of 2020/21 | General | Interior Door Replacement at Philip Sheridan Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, SEPTEMBER 30, 2021 AT 10:00 AM Zoom Link For Bid | Addendum1 | Philip Sheridan Elementary School | $619,370 | Bid Results |
09/10 | 10/12/21 | B-008C of 2021/22 | General | Demolition of The Cassidy School A SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON FRIDAY, SEPTEMBER 17, 2021 Additional site visit on October 6, 2021 from 10am to 12 pm. Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 | Lewis C. Cassidy School | $2,580,418 | Bid Results Plan Holders List |
09/03 | 09/28/21 | B-075C of 2019/20 | General | Major HVAC Renovation at Lewis Elkin School A SITE VISIT HAS BEEN SCHEDULED FOR SEPTEMBER 20, 2021 AT 7 AM Walkthrough Sign-in Sheet Zoom Link For Bid | Addendum1 Addendum2 | LEWIS ELKIN ELEMENTARY SCHOOL | $732,367 | Bid Results Plan Holders List |
B-076C of 2019/20 | Mechanical | $3,981,783 | Bid Results | |||||
B-077C of 2019/20 | Plumbing | $317,918 | Bid Results | |||||
B-078C of 2019/20 | Electrical | $884,614 | Bid Results | |||||
09/01 | 09/28/21 | B-019C of 2020/21 | General | INTERIOR DOOR REPLACEMENT AT JOHN MARSHALL ELEMENTARY A SITE VISIT HAS BEEN SCHEDULED FOR SEPTEMBER 15, 2021 AT 10:00 AM Zoom Link For Bid | Addendum1 Addendum2 | JOHN MARSHALL ELEMENTARY SCHOOL | $456,461 | Bid Results Plan Holders List |
08/23 | 09/28/21 | B-142C of 2017/18 | General | Window Replacement at W.T. Comly Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, SEPTEMBER 9, 2021 AT 10:00 AM Walk through Sign-In Sheet Zoom Link For Bid | Addendum1 Addendum2 Addendum3 | W.T. Comly Elementary School | $1,639,525 | Bid Results |
08/11 | 09/9/21 | B-026C of 2019/20 | General | Building Envelope Renovations A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, AUGUST 17, 2021 AT 1:00 PM Zoom Link For Bid Opening | Addemdum1 | Fox Chase Elementary School | $2,984,212 | Bid Results |
05/06 | 08/31/21 | B-078C of 2018/19 | Electrical | Fire Alarm Replacement At General Harry Labrum Middle School The Prebid Walk Through is rescheduled to 10:00 AM on FRIDAY, 05/14/2021. Walkthrough Sign in Sheet A PREBID WALK-THROUGH AT THE PROJECT LOCATION IS SCHEDULED AT: 10AM ON WEDNESDAY, 06/16/2021 Walkthrough Sign In Sheet Zoom Link for bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 Addendum6 Addendum7 Addendum8 | General Harry Labrum Middle School | $225,000 | Bid Results Plan Holders List |
08/10 | 09/02/21 | B-047C of 2020/21 | Electrical | Electrical Bus Charging Stations A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, AUGUST 17, 2021 AT 10:00 AM Walkthrough Sign In Sheets Zoom Link for Bid Opening | Addendum1 Addendum2 | Passyunk Garage 6421 W. Passyunk Ave. | $145,503 | Bid Results |
08/10 | 09/02/21 | B-043C of 2020/21 | Electrical | Electrical Bus Charging Stations A SITE VISIT HAS BEEN SCHEDULED FOR WEDNESDAY, AUGUST 18, 2021 AT 10:00 AM Walkthrough Sign In Sheet Zoom Link for bid Opening | Addendum1 Addendum2 | Broad Street Garage 2600 Broad Street | $129,352 | Bid Results |
07/28 | 08/31/21 | B-053C of 2018/19 | Electrical | Relighting Project at Samuel Pennypacker School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, AUGUST 10, 2021 AT 10:00 AM Walkthrough Sign In Sheet Zoom Link for bid Opening | Addendum1 | Pennypacker School | $640,759 | Bid Results Plan Holders List |
07/23 | 09/02/21 | B-068 C of 2018/19 | General | Building Envelope Renovations Project at James J. Sullivan Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, AUGUST 3, 2021 AT 1:00 PM Walkthrough Sign In Sheet Zoom Link for bid Opening | Addendum1 Addendum2 | James J. Sullivan Elementary School | $4,159,330 | Bid Results Plan Holders List |
07/08 | 07/27/21 | Facilities Management and Services - General Service Contracts | Facilities Management and Services | General Service Contracts | Various Locations | N/A | ||
06/30 | 07/27/21 | B-047C of 2018/19 | Electrical | Relighting Project at James Sullivan School A SITE VISIT HAS BEEN SCHEDULED FOR Wednesday, JULY 14, 2021 AT 10:00 AM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 | James Sullivan School | $649,428 | Bid Results Plan Holders List |
06/17 | 07/29/21 | B-009C of 2020/21 | Electrical | Electrical Upgrades at Philadelphia High School for Girls A SITE VISIT HAVE BEEN SCHEDULED FOR: TUESDAY, JUNE 29TH, 2021 AT 10:00AM Walkthrough Sign In Sheet Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | Philadelphia High School for Girls | $4,610,025 | Bid Results Plan Holders List |
B-010C of 2020/21 | General | $1,066,556 | Bid Results | |||||
06/11 | 07/29/21 | B-061C of 2020/21 | General | T.M. Peirce New Elementary School A PRE-BID MEETING ONSITE is Scheduled for June 29 at 11:00 AM Zoom Link For Virtual Site Visit Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | T.M. Peirce New Elementary School | $19,875,351 | Bid Results Plan Holders List |
B-062C of 2020/21 | Mechanical | $4,388,967 | Bid Results | |||||
B-063C of 2020/21 | Electrical | $4,537,195 | Bid Results | |||||
B-064C of 2020/21 | Plumbing | $1,944,351 | Bid Results | |||||
05/19 | 07/22/21 | B-072C of 2018/19 | General | Major HVAC Renovation At Franklin S. Edmonds School SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM, TUESDAY JUNE 1, 2021 Mechanical Schedules Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 Addendum6 | Franklin S. Edmonds School | $482,395 | Bid Results Plan Holders List |
B-073C of 2018/19 | Mechanical | $3,444,331 | Bid Results | |||||
B-074C of 2018/19 | Electrical | $1,023,250 | Bid Results | |||||
05/12 | 05/27/21 | B-002G of 2020/21 | General | Asbestos Abatement, Environmental Cleanup And Re-Insulation Work At SLA Middle School @ Beeber A pre-bid meeting and site visit has been scheduled for 10:00 AM on TUESDAY, MAY 18, 2021 at the project site. Zoom Link For Bid Opening | Addendum1 | SLA Middle School @ Beeber | $302,000 | Bid Results Plan Holders List |
05/07 | 05/27/21 | B-006C of 2021/22 | Mechanical | Air Conditioning Upgrade At Northeast High School Walkthroughs: (1) TUESDAY, MAY 11, 2021 AT 12:00 NOON (2) TUESDAY, MAY 18, 2021 AT 10:00 AM Walkthrough Sign In Sheet Zoom Link For Bid Opening | Addendum1 Addendum2 | Northeast High School | $534,284 | Bid Results Plan Holders List |
B-007C of 2021/22 | Electrical | $448,847 | Bid Results | |||||
04/30 | 05/25/21 | B-081C of 2018/19 | Electrical | Fire Alarm System Replacement at Anna Blakiston Day School The Prebid Walk Through is rescheduled to 10am on Tuesday, 05/11/2021. Walkthrough Sign in Sheet Zoom Link For Bid Opening | Addendum1 Addendum2 | Anna Blakiston Day School | $210,530 | Bid Results Plan Holders List |
04/09 | 05/06/21 | B-050C of 2020/21 | General | Science Lab Renovations at Science Leadership Academy at Beeber A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY APRIL 15, 2021 AT 10:00 AM Walkthrough Sign In Sheet Zoom link for Bid Opening | Addendum1 Addendum2 | Science Leadership Academy at Beeber | $553,630 | Bid Results Plan Holders List |
B-051C of 2020/21 | Mechanical | $55,170 | Bid Results | |||||
B-052C of 2020/21 | Plumbing | $201,845 | Bid Results | |||||
B-053C of 2020/21 | Electrical | $117,810 | Bid Results | |||||
03/29 | 04/20/21 | B-084C of 2018/19 | Electrical | Fire Alarm System Replacement at Allen M. Stearne Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR 10:00AM ON WEDNESDAY, April 7, 2021 An additional pre-bid walk-through will be available on 04/09/2021, 10AM. Zoom Link For Bid Opening | Addendum1 Addendum2 | Allen M. Stearne Elementary School | $294,880 | Bid Results Plan Holders List |
03/29 | 04/20/21 | B-017C of 2018/19 | Mechanical | Refrigerant Monitoring System at Allen M. Stearne Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR 10:00AM ON WEDNESDAY, April 7, 2021 An additional pre-bid walk-through will be available on 04/09/2021, 10AM. Walkthrough Sign In Sheet Zoom Link For Bid Opening | Addendum1 | Allen M. Stearne Elementary School | $30,000 | Bid Results Plan Holders List |
03/09 | 04/08/21 | B-022C of 2020/21 | General | Culinary Arts Suite Renovation at General Louis Wagner Middle School A SITE VISIT HAS BEEN SCHEDULED FOR MONDAY, MARCH 15 2021 AT 10:00 AM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 | General Louis Wagner Middle School | $372,537 | Bid Results Plan Holders List |
B-023C of 2020/21 | Mechanical | $81,456 | Bid Results | |||||
B-024C of 2020/21 | Plumbing | $93,301 | Bid Results | |||||
B-025C of 2020/21 | Electrical | $182,609 | Bid Results | |||||
03/05 | 04/06/21 | B-070 C of 2019/20 | General | Major Addition and Renovation at Rhawnhurst Elementary School SITE WALK THROUGH’S HAVE BEEN SCHEDULED FOR PRE-BID PURPOSES ON:THURSDAY, MARCH 11th at 10:00 AM AND THURSDAY, MARCH 18TH at 2:30 PM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | Rhawnhurst Elementary School | $12,518,021 | Bid Results Plan Holders List |
B-071 C of 2019/20 | Mechanical | $4,168,398 | Bid Results | |||||
B-072 C of 2019/20 | Plumbing | $2,251,103 | Bid Results | |||||
B-073 C of 2019/20 | Electrical | $2,812,550 | Bid Results | |||||
03/03 | 03/23/21 | B-001 G of 2020/21 | General | Asbestos Abatement and Environmental Clean-Up Work at Edwin Forrest School A pre-bid meeting and site visit has been scheduled for 10:00 AM on TUESDAY, MARCH 9, 2021 at the project site. Zoom Link For Bid Opening | Edwin Forrest School | $ 86,760 | Bid Results Plan Holders List |
|
02/10 | 03/16/21 | B-063C of 2018/19 | General | Bathroom ada Upgrades and Plumbing Piping Replacement at Andrew J. Morrison School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY FEBRUARY 18, 2021 AT 10:00 AM . PRE-BID MEETING AND SITE VISIT RESCHEDULED TO 10:00 AM, MONDAY, MARCH 1, 2020 Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 | Andrew J. Morrison School | $366,448 | Bid Results Plan Holders List |
B-062C of 2018/19 | Plumbing | $652,282 | Bid Results | |||||
02/05 | 03/23/21 | B-069C of 2018/19 | General | Elevator Replacement at Julia R. Masterman School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY FEBRUARY 16, 2021 AT 10:00 AM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 | Julia R. Masterman School | $645,550 | Bid Results |
02/05 | 03/04/21 | B-060 C of 2019/20 | General | New Cafeteria at Blankenburg Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, FEBRUARY 11th, 2021 AT 12:00 PM Walkthrough Sign In Sheet | Addendum1 Addendum2 Addendum3 Addendum4 | Blankenburg Elementary School | $677,017 | Bid Results Plan Holders List |
B-061 C of 2019/20 | Mechanical | $335,150 | Bid Results | |||||
03/11/21 | B-062 C of 2019/20 | Plumbing | Zoom Link For Bid Opening | $238,234 | Bid Results | |||
B-063 C of 2019/20 | Electrical | $238,468 | Bid Results | |||||
02/03 | 03/02/21 | B-045C of 2020/21 | General | Classroom Modernization at Add B. Anderson Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, FEBRUARY 11 2021 AT 9:00 AM Walkthrough Sign In Sheet Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 | Add B. Anderson Elementary School | $801,274.47 | Bid Results Plan Holders List |
B-046C of 2020/21 | Mechanical and Plumbing | $74,060.77 | Bid Results | |||||
B-048C of 2020/21 | Electrical | $270,142.23 | Bid Results | |||||
02/03 | 03/02/21 | B-037 C of 2020/21 | General | Classroom Modernization at Rudolph Blankenburg Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR THURSDAY, FEBRUARY 11 2021 AT 11:00 AM Walkthrough Sign In Sheet Zoom Link For Bid Opening | Addendum1 Addendum2 | Rudolph Blankenburg Elementary School | $874,531.70 | Bid Results Plan Holders List |
B-038 C of 2020/21 | Mechanical | $312,142.93 | Bid Results | |||||
B-040 C of 2020/21 | Electrical | $64,279 | Bid Results | |||||
02/03 | 03/02/21 | B-041 C of 2020/21 | General | Classroom Modernization at Henry H. Houston Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR FRIDAY, FEBRUARY 12th, 2021 AT 10:00 AM Walkthrough Sign In Sheet Zoom Link For Bid Opening | Addendum1 Addendum2 | Henry H. Houston Elementary School | $577,648.23 | Bid Results Plan Holders List |
B-042 C of 2020/21 | Mechanical | $104,233.31 | Bid Results | |||||
B-044 C of 2020/21 | Electrical | $135,622.16 | Bid Results | |||||
02/01 | 03/02/21 | B-010C of 2020/21 | General | New Athletic Fields and Stadium Renovations at Abraham Lincoln High School A SITE VISIT HAS BEEN SCHEDULED FOR MONDAY, FEBRUARY 8 2021 AT 10:00 AM Zoom Link For Bid Opening | Addendum1 Addendum2 | Abraham Lincoln High School | $2,842,049 | Bid Results Plan Holders List |
B-011C of 2020/21 | Plumbing | $124,062 | Bid Results | |||||
B-012C of 2020/21 | Electrical | $598,538 | Bid Results | |||||
02/01 | 02/25/21 | B-031C of 2020/21 | General | Classroom Modernization at Bregy Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, FEBRUARY 9 2021 AT 9:00 AM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | Bregy Elementary School | $652,053.91 | Bid Results Plan Holders List |
B-033C of 2020/21 | Electrical | $231,838.37 | Bid Results | |||||
02/01 | 02/25/21 | B-034C of 2020/21 | General | Classroom Modernization at Longstreth Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, FEBRUARY 9 2021 AT 11:00 AM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 | Longstreth Elementary School | $789,086.53 | Bid Results Plan Holders List |
B-035C of 2020/21 | Plumbing | $127,220.69 | Bid Results | |||||
B-036C of 2020/21 | Electrical | $298,976.58 | Bid Results | |||||
02/01 | 02/25/21 | B-028C of 2020/21 | General | Classroom Modernization at Vare Washington Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, FEBRUARY 9 2021 AT 1:00 PM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 | Vare Washington Elementary School | $692,836.01 | Bid Results Plan Holders List |
01/26 | 02/23/21 | B-020C of 2020/21 | General | Classroom Modernization at Philip Sheridan School The pre-bid walk through has been re-scheduled for: Thursday, Feb. 4, 2021 at 1:15 PM Zoom Link for Bid Opening | Addendum1 Addendum2 | Philip Sheridan School | $1,302,760.48 | Bid Results Plan Holders List |
B-021C of 2020/21 | Electrical | $514,901.80 | Bid Results | |||||
01/26 | 02/23/21 | B-014C of 2020/21 | General | Classroom Modernization at William Cramp School The pre-bid walk through has been re-scheduled for: Thursday, Feb. 4, 2021 at 12:00 PM Zoom Link for Bid Opening | Addendum1 Addendum2 | William Cramp School | $1,531,444.45 | Bid Results Plan Holders List |
B-015C of 2020/21 | Electrical | $553,959.26 | Bid Results | |||||
01/26 | 02/23/21 | B-017C of 2020/21 | General | Classroom Modernization at Laura H Carnell School The pre-bid walk through has been re-scheduled for: Thursday, Feb. 4, 2021 at 2:30 PM Zoom Link for Bid Opening | Addendum1 Addendum2 | Laura H Carnell School | $1,336,121.43 | Bid Results Plan Holders List |
B-018C of 2020/21 | Electrical | $597,555.28 | Bid Results | |||||
01/25 | 03/16/21 | B-065 C of 2017/18 | General | Roof Replacement at General George G. Meade Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR WEDNESDAY, FEBRUARY 17 2021 AT 9:30 AM Pre-Bid Zoom Link Meeting ID: 965 2667 1483 Passcode: 759981 Walkthrough Sign In Sheet 1 Walkthrough Sign In Sheet 2 Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 | General George G. Meade Elementary School | $844,048 | Bid Results Plan Holders List |
01/19 | 02/23/21 | B-059C of 2018/19 | General | Elevator Replacement at John H. Webster Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR MONDAY, JANUARY 25, 2021 AT 10:00 AM Walkthrough Sign in Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | John H. Webster Elementary School | $442,300 | Bid Results Plan Holders List |
01/11 | 02/09/21 | B-086 C of 2019/20 | General | Exterior Door Replacement at Mitchell Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR TUESDAY, January 19, 2021 AT 10:00 AM Walkthrough Sign in Sheet Zoom Link For Bid Opening | Addendum1 | Mitchell Elementary School | $388,542 | Bid Results Plan Holders List |
08/03 | 01/26/21 | B-045 C of 2018/19 | Electrical | Electrical Upgrades at Edward Gideon Elementary School Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 Addendum6 Addendum7 | Edward Gideon Elementary School | $2,049,403 | Bid Results Plan Holders List |
11/13 | 01/14/21 | B-101 C of 2017/18 | General | Boiler Replacement at Andrew J. Morrison Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR 2;00 PM ON MONDAY, NOVEMBER 23, 2020 Zoom Link For Bid Opening | Addendum1 Addendum2 | Andrew J. Morrison Elementary School | $137,297 | Bid Results Plan Holders List |
B-102 C of 2017/18 | Mechanical | $2,007,277 | Bid Results | |||||
B-132 C of 2017/18 | Plumbing | $150,270 | Bid Results | |||||
B-103 C of 2017/18 | Electrical | $193,089 | Bid Results | |||||
11/13 | 01/05/21 | B-087 C of 2017/18 | General | Mechanical Plant Replacement at Joseph Pennell Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON TUESDAY, NOVEMBER 24, 2020 A SITE VISIT HAS BEEN RESCHEDULED FOR 10:00 AM, MONDAY, NOVEMBER 30, 2020 Walkthrough Sign in Sheet Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | Joseph Pennell Elementary School | $365,745 | Bid Results |
B-088 C of 2017/18 | Mechanical | $1,184,994 | Bid Results | |||||
B-089 C of 2017/18 | Electrical | $240,596 | Bid Results | |||||
B-090 C of 2017/18 | Plumbing | N/A | Bid Results | |||||
11/13 | 01/19/21 | B-115C of 2017/18 | Mechanical | ATC Replacement at Pennypacker Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON TUESDAY, DECEMBER 1ST, 2020 Click Here For Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | Pennypacker Elementary School | $786,971 | Bid Results |
B-116C of 2017/18 | Electrical | $211,285 | Bid Results | |||||
11/06 | 12/10/20 | B-001 C of 2020/21 | General | Major Renovations - Phase 2 at Anna B. Pratt School A SITE VISIT HAS BEEN SCHEDULED FOR 9:00 AM, THURSDAY NOVEMBER 19, 2020 Walkthrough Sign In Sheet 1 Walkthrough Sign In Sheet 2 An Additional Walkthrough has been scheduled for Tuesday, December 1, 2020 10:00 AM Walkthrough Sign In Sheet 2 Zoom Link for Bid Opening | Addendum1 Addendum2 | Anna B. Pratt School | $6,998,129.14 | Bid Results |
B-002 C of 2020/21 | Mechanical | $935,080.41 | Bid Results | |||||
B-003 C of 2020/21 | Plumbing | $634,827.60 | Bid Results | |||||
B-004 C of 2020/21 | Electrical | $3,282,032.89 | Bid Results | |||||
11/06 | 12/15/20 | B-005 C of 2020/21 | General | Major Renovations Phase 2 at Andrew Hamilton Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON TUESDAY, NOVEMBER 17 2020 Walkthrough Sign In Sheet Zoom Link For Bid Opening | Addendum1 Addendum2 | Andrew Hamilton School | $1,940,385 | Bid Results |
B-007 C of 2020/21 | Plumbing | $194,724 | Bid Results | |||||
B-008 C of 2020/21 | Electrical | $338,433 | Bid Results | |||||
11/02 | 12/08/20 | B-044 C of 2019/20 | General | Demolition at T.M. Peirce Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR 2:00 PM ON MONDAY, NOVEMBER 16, 2020 Walkthrough Sign In Sheet AN ADDITIONAL SITE VISIT IS SCHEDULED FOR 10:00 AM, TUESDAY, NOVEMBER 24, 2020 As Built Documents - For Reference Only Zoom Link for Bid Opening | Addendum1 Addendum2 | T.M. Peirce Elementary School | $2,432,484 | Bid Results |
10/21 | 11/24/20 | B-015 C of 2018/19 | Mechanical | Building Automation System Replacement at CAPA High School A SITE VISIT HAS BEEN SCHEDULED FOR 10:00 AM ON WEDNESDAY, NOVEMBER 4, 2020 Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 | CAPA High School | $951,641.41 | Bid Results |
B-016 C of 2018/19 | Electrical | $104,188.74 | Bid Results | |||||
10/13 | 11/05/20 | B-082 C of 2018/19 | Electrical | Fire Alarm Replacement at Stephen Decatur School A SITE VISIT HAS BEEN SCHEDULED FOR Wednesday, October 21, 2020 at 10:00 AM Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 | Stephen Decatur School | $505,641 | Bid Results |
10/02 | 11/05/20 | B-060C of 2018/19 | General | Masonry Restoration and Paul L. Dunbar Elementary School A PRE-BID MEETING AND SITE VISIT HAS BEEN SCHEDULED FOR 1:30 PM ON THURSDAY, OCTOBER 15, 2020 Walkthrough Sign in Sheet Zoom Link for Bid Opening | Addendum1 | Paul L. Dunbar Elementary School | $2,261,411.20 | Bid Results |
10/02 | 11/05/20 | B-049 C of 2018/19 | Mechanical | Chiller Plant Replacement at Feltonville Intermediate School PREBID MEETING/SITE VISIT RE-SCHEDULED TO THURSDAY, OCTOBER 8, 2020 AT 1:00 PM Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 | Feltonville Intermediate School | $1,062,450 | Bid Results Plan Holders List |
B-050 C of 2018/19 | Electrical | $175,729 | Bid Results | |||||
10/02 | 11/24/20 | B-007 C of 2018/19 | General | ADA Bathroom Upgrades Science Leadership Academy at Beeber A SITE VISIT HAS BEEN SCHEDULED FOR 1:00 PM ON FRIDAY, OCTOBER 9, 2020 Walkthrough Sign in Sheet AN ADDITIONAL SITE VISIT IS SCHEDULED FOR 2:00 PM, MONDAY, NOVEMBER 2, 2020 https://www.philasd.org/capitalprograms/wp-content/uploads/sites/18/2020/11/Pre-Bid-walk-Through-Sign-In-Sheet-110220.pdfWalkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Science Leadership Academy at Beeber | $848,287 | Bid Results Plan Holders List |
B-008 C of 2018/19 | Mechanical | $240,108.06 | Bid Results | |||||
B-009 C of 2018/19 | Plumbing | $942,177.06 | Bid Results | |||||
B-010 C of 2018/19 | Electrical | $230,359.84 | Bid Results | |||||
09/29 | 10/20/20 | B-064 C of 2018/19 | Electrical | Fire Alarm Replacement at Conwell Middle School Annex A SITE VISIT HAS BEEN SCHEDULED FOR 10:00AM ON WEDNESDAY, OCTOBER 7, 2020 Walkthrough Sign In Sheet Zoom Link for Bid Opening | Addendum1 | Conwell Middle School Annex | $212,670 | Bid Results |
09/11 | 11/05/20 | B-056 C of 2018/19 | General | Uni-Vent and Temperature Control Replacement at John F. Hartranft A SITE VISIT HAS BEEN SCHEDULED FOR 10:00AM ON TUESDAY, SEPTEMBER 22 2020 Walkthrough Sign in Sheet Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 | John F. Hartranft Elementary School | $160,423 | Bid Results Plan Holders List |
B-057 C of 2018/19 | Mechanical | $3,451,635 | Bid Results | |||||
B-058 C of 2018/19 | Electrical | $ 554,554 | Bid Results | |||||
09/08 | 09/22/20 | B-054 of C 2019/20 | General | Annex Demolition at Henry C. Lea Elementary School A SITE VISIT HAS BEEN SCHEDULED FOR 1:00 PM ON FRIDAY, SEPTEMBER 11 2020 Walkthrough Sign in Sheet Zoom Link for Bid Opening | Addendum1 | Henry C. Lea Elementary School | $755,400.25 | Bid Results |
08/25 | 10/13/20 | B-096 of C 2017/18 | General | Thomas G. Morton HVAC Replacement A SITE VISIT HAS BEEN SCHEDULED FOR 10:00AM ON TUESDAY, SEPTEMBER 8, 2020 Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Thomas G. Morton | $ 169,177 | Bid Results |
B-097 of C 2017/18 | Mechanical | $ 2,916,641 | Bid Results | |||||
B-098 of C 2017/18 | Electrical | $1,137,698 | Bid Results | |||||
08/18 | 09/22/20 | B-107 C of 2017/18 | General | Structural Repairs at James R. Ludlow Elementary School A PRE-BID MEETING AND SITE VISIT HAS BEEN SCHEDULED FOR 1:30 PM ON THURSDAY, AUGUST 20, 2020 An additional project pre-bid site walk-thru visit at the school has been scheduled for 11:00 AM on Tuesday, September 15, 2020 Zoom Link for Bid Opening | Addendum1 Addendum2 Addendum3 Specificationfor Asbestos Abatement / Reinsulation AIR | James R Ludlow Elementary School | $1,756,721 | Bid Results Plan Holders List |
07/22 | 08/25/20 | B-036 of C 2019/20 | General | Penn Treaty High School Science Lab Renovations A SITE VISIT HAS BEEN SCHEDULED FOR 10:00AM ON TUESDAY, JULY 28, 2020 Walkthrough Sign in Sheet Zoom Link For Bid Opening | Addendum1 As Builts Documents Addendum2 Typical Window Images Key Plan | Penn Treaty High School | $661,280 | Bid Results |
B-037 of C 2019/20 | Mechanical | $96,500 | Bid Results | |||||
B-038 of C 2019/20 | Plumbing | $272,034 | Bid Results | |||||
B-039 of C 2019/20 | Electrical | $161,414 | Bid Results | |||||
03/13 | 06/16/20 | B-040 C of 2019/20 | General | Major Renovation Click Here for Link To Bid Documents Virtual Walkthrough Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | James Rhoads Elementary School | $2,924,856 | Plan Holders List Bid Results |
B-041 C of 2019/20 | Mechanical | $3,076,811 | Bid Results | |||||
B-042 C of 2019/20 | Plumbing | $232,254 | Bid Results | |||||
B-043 C of 2019/20 | Electrical | $1,674,667 | Bid Results | |||||
05/12 | 07/07/20 | B-011C of 2018/19 | Genaral | New Addition and Renovations Click Here For Bid Documents Updated Drawings A VIDEO PRE-BID CONFERENCE WILL BE HELD ON THURSDAY, MAY 21, 2020 AT 10:00 AM Link To Virtual Walkthrough Walkthrough Agenda A SITE VISIT HAS BEEN SCHEDULED FOR 10:00AM ON MONDAY, JUNE 29, 2020 Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 Addendum6 | Ethan Allen Elementary School | $10,134,334 | Bid Results Plan Holders List |
B-012C of 2018/19 | Mechanical | $3,449,346 | Bid Results | |||||
B-013C of 2018/19 | Plumbing | $919,515 | Bid Results | |||||
B-014C of 2018/19 | Electrical | $3,794,156 | Bid Results | |||||
05/04 | 05/19/20 | GSC 020 - GSC 026 | Various GSCs | HVAC/Asphalt Repairs/Boiler Burner Repairs/Concrete Block Repairs/Emergency Generators/Fire Alarm/High Voltage Click Here For Bid Documents Zoom Link For Bid Opening Meeting ID: 829 1580 9814 Password: 253486 | Please See Individual Bid Documents for Pre-Bid Conference Call In Time And Date. Phone Number: 215-400-5100 Passcode is 500357 | Various Schools | N/A | |
04/30 | 05/19/20 | B-023 of C 2019/20 | GSC | Asbestos Abatement and Environmental Clean-Up Walk through has been scheduled for Wednesday, May 6, 2020 at 8:00 AM Zoom Link For Bid Opening Meeting ID: 851 7973 1745 Password: wc5Nzv | Addendum1 | Ethan Allen School | $150,000 | Bid Results |
04/30 | 05/19/20 | B-020 of C 2019/20 | GSC | Asbestos Abatement and Environmental Clean-Up WALK THROUGH has been scheduled for Wednesday, May 6, 2020 at 12:00 NOON Zoom Link For Bid Opening Meeting ID: 851 7973 1745 Password: wc5Nzv | Addendum1 | Lewis C. Cassidy Academic Plus School | $119,160 | Bid Results |
04/15 | 05/19/20 | B-065C of 2018/19 | General | Boiler Replacement Click Here for Link to Bid Documents NO PRE-BID CONFERENCE AND TOUR OF THE EXISTING FACILITIES AT THE PROJECT SITE WILL BE HELD FOR THIS PROJECT Zoom Link For Bid Opening Meeting ID: 851 7973 1745 Password: wc5Nzv | Addendum1 Addendum2 | William L. Sayre High School | $274,087 | Bid Results Plan Holders List |
B-066C of 2018/19 | Mechanical | $1,692,337 | Bid Results | |||||
B-067C of 2018/19 | Electrical | $202,037 | Bid Results | |||||
03/30 | 04/21/20 | B-055C of 2019/20 | General | Summer 2020 Renovations Click here for documents THE PREBID MEETING AND SITE VISIT AT THE PROJECT SITE AT 10:00 AM ON THURSDAY, APRIL 9, 2020 HAS BEEN CANCELLED Zoom Link For Bid Opening Meeting ID: 337 892 697 Password: 014639 | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Ben Franklin High School/Science Leadership Academy | $1,750,000 | Bid Results |
B-056C of 2019/20 | Mechanical | $1,100,000 | Bid Results | |||||
B-057C of 2019/20- | Plumbing | $2,000,000 | Bid Results | |||||
B-058C of 2019/20 | Electrical | $750,000 | Bid Results | |||||
03/30 | 04/28/20 | B-075C of 2018/19 | General | Flood Remediation - Click Here for link to documents THE PREBID MEETING AND SITE VISIT AT THE PROJECT SITE AT 10:00 AM ON FRIDAY, APRIL 10, 2020 HAS BEEN CANCELLED Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 | Duckery Elementary School | $1,218,986 | Bid Results |
B-076C of 2018/19 | Mechanical | $1,933,268 | Bid Results | |||||
B-077C of 2018/19 | Electrical | $2,007,000 | Bid Results | |||||
B-087C of 2018/19 | Plumbing | $776,300 | Bid Results | |||||
02/28 | TBD | B-002-2 C OF 2019/20 | General | Asbestos Abatement and Environmental Cleanup - T&M | Addendum1 | Various Schools | $3,000,000 | |
02/24 | 04/09/20 | B-051 C of 2019/20 | General | Major Renovation Phase 1 Click here for the Project Documents Zoom Link for Bid Opening Password:405840 | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Anna B. Pratt Elementary School | $1,362,549 | Bid Results Plan Holders List 1 Plan Holders List 2 |
B-052 C of 2019/20 | Mechanical | $867,045 | Bid Results | |||||
B-053 C of 2019/20 | Electrical | $496,833 | Bid results | |||||
02/24 | 05/05/20 | B-045 C of 2019/20 | General | Renovation and Addition Zoom Link For Bid Opening | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 Addendum6 Addendum7 | Anne Frank Elementary School | $13,813,675 | Bid Results Plan Holders List |
B-046 C of 2019/20 | Mechanical | $4,888,027 | Bid Results | |||||
B-047 C of 2019/20 | Plumbing | $1,180,494 | Bid Results | |||||
B-048 C of 2019/20 | Electrical | $5,194,743 | Bid Results | |||||
02/20 | 03/12/20 | B-031 C of 2019/20 | General | Classroom Modernization/Paint and Plaster A pre-bid conference and site tour will be held at the project location, on Tuesday, February 25, 2020 at 10:30 A.M. Walkthrough Sign in Sheet | Addendum1 | John Marshall School | $1,715,417 | Bid Results |
B-033 C of 2019/20 | Electrical | Classroom Modernization/Paint and Plaster | $318,663 | Bid Results | ||||
02/20 | 03/12/20 | B-028 C of 2019/20 | General | Classroom Modernization/Paint and Plaster A pre-bid conference and site tour will be held at the project location, on Tuesday, February 25, 2020 at 9:00 A.M. Walkthrough Sign in Sheet | Addendum1 | Overbrook Educational Center | $1,467,053 | Bid Results |
B-030 C of 2019/20 | Electrical | Classroom Modernization/Paint and Plaster | $411,846 | Bid Results | ||||
02/20 | 03/12/20 | B-016C of 2019/20 | General | Classroom Modernization/Paint and Plaster A pre-bid conference and site tour will be held at the project location, on Tuesday, February 25, 2020 at 12:00 P.M. Walkthrough Sign in Sheet | Addendum1 | John B. Kelly School | $3,177,265 | Bid Results |
B-018C of 2019/20 | Electrical | Classroom Modernization/Paint and Plaster | $602,028 | Bid Results | ||||
02/14 | 02/25/20 | B-002-1 C of 2019/20 | General | Asbestos Abatement and Environmental Clean-Up Work A Pre-Bid Meeting and Information Session has been scheduled at 9:00 AM on Wednesday, February 19, 2020 at:440 North Broad Street Office of Capital Programs Conference Room 3126 Philadelphia, Pa 19130 Pre-bid Meeting Sign in Sheet | Various Locations | $3,000,000 | Bid Results | |
02/07 | 03/05/20 | B-025 C of 2019/20 | General | Classroom Modernization A pre-bid conference and site tour will be held at the project location, on Tuesday, February 18, 2020 at 2:00 P.M. Walkthrough Sign in Sheet | Addendum1 | Robert Pollock Elementary School | $2,951,951 | Bid Results |
B-027 C of 2019/20 | Electrical | Classroom Modernization | $407,567 | Bid Results | ||||
02/07 | 03/10/20 | B-013 C of 2019/20 | General | Classroom Modernization A pre-bid conference and site tour will be held at the project location, on Tuesday, February 18, 2020 at 9:00 A.M. Walkthrough Sign in Sheet | Addendum1 Addendum 2 | John Welsh Elementary School | $1,881,620 | Bid Results |
B-015 C of 2019/20 | Electrical | Classroom Modernization | $282,828 | Bid Results | ||||
02/07 | 03/05/20 | B-022 C of 2019/20 | General | Classroom Modernization A pre-bid conference and site tour will be held at the project location, on Tuesday, February 18, 2020 at 12:00 P.M. Walkthrough Sign in Sheet | Addendum1 | Fox Chase Elementary School | $1,683,647 | Bid Results |
B-024 C of 2019/20 | Electrical | Classroom Modernization | $359,839 | Bid Results | ||||
02/07 | 03/05/20 | B-019 C of 2019/20 | General | Classroom Modernization A pre-bid conference and site tour will be held at the project location, on Tuesday, February 18, 2020 at 10:30 A.M. Walkthrough Sign in Sheet | Addendum1 | Ellwood Elementary School | $2,023,058 | Bid Results |
B-021 C of 2019/20 | Electrical | Classroom Modernization | $328,504 | Bid Results | ||||
02/03 | 03/10/20 | B-007 C of 2019/20 | General | Classroom Modernization A pre-bid conference and site tour will be held at the project location, on Tuesday, February 11, 2020 at 10:30 A.M. Walkthrough Sign in Sheet | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | George Sharswood Elementary School | $1,235,094 | Bid Results |
B-009 C of 2019/20 | Electrical | Classroom Modernization | $388,810 | Bid Results | ||||
02/03 | 03/10/20 | B-001 C of 2019/20 | General | Classroom Modernization A pre-bid conference and site tour will be held at the project location, on Tuesday, February 11, 2020 at 9:00 A.M. Walkthrough Sign in Sheet | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Francis Scott Key Elementary School | $1,037,473 | Bid Results |
B-003 C of 2019/20 | Electrical | Classroom Modernization | $344,408 | Bid Results | ||||
02/03 | 03/10/20 | B-010 C of 2019/20 | General | Classroom Modernization A pre-bid conference and site tour will be held at the project location, on Tuesday, February 11, 2020 at 2:00 P.M. Walkthrough Sign in Sheet | Addendum1 Addendum2 Addendum 3 | Cayuga Elementary School | $1,534,322 | Bid Results |
B-012 C of 2019/20 | Electrical | Classroom Modernization | $410,627 | Bid Results | ||||
02/03 | 03/12/20 | B-004 C of 2019/20 | General | Classroom Modernization A pre-bid conference and site tour will be held at the project location, on Tuesday, February 11, 2020 at 12:30 P.M. Walkthrough Sign in Sheet | Addendum1 Addendum2 Addendum3 Addendum4 | Gompers Elementary School | $1,850,287 | Bid Results |
B-006 C of 2019/20 | Electrical | Classroom Modernization | $228,247 | Bid Results | ||||
01/28 | 02/25/20 | B-008 C of 2019/20 | General | Retaining Wall Replacement A Pre-Bid Conference and Tour of the existing facilities will be held on Tuesday, February 4, 2020 at 2:30PM at the project site. | Addendum1 Addendum2 | Mastery Charter Mann Elementary | $1,375,162 | Bid Results |
12/23 | 03/31/20 | Paint and Plaster Rolling Submissions | RFQ - Paint and Plaster Rolling Submissions Sample Contract 1 Sample Contract 2 | SDP | ||||
12/17 | 01/7/20 | B-005 C of 2019/20 | General | Asbestos Abatement and Environmental Clean-Up Work A pre-bid meeting and site visit has been scheduled for 10:00 AM on Thursday, December 19, 2019 atthe project site. | Anna B. Pratt School | $901,600 | Bid Results | |
12/16 | 01/14/20 | B-083 C of 2018/19 | Mechanical | Unit Ventilator and Mechanical Piping Replacement A pre-bid conference and site tour will be held at the project location, on Thursday, December 19, 2019 at 10:00 A.M. Walkthrough Sign In Sheet | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Mary McLeod Bethune Elementary School | $1,735,927 | Bid Results |
B-085 C of 2018/19 | Electrical | $101,984 | Bid Results | |||||
11/25 | 12/19/19 | B-049 C of 2018/19 | General | Roof Replacement A pre-bid conference and site tour will be held at the project location, on Thursday, December 5, 2019 at 10:00 A.M. | Addendum1 | Forrest Elementary School | $364,292 | Bid Results |
11/20 | 12/12/19 | B-002 C of 2019/20 | General | Asbestos Abatement and Environmental Clean-Up Work A pre-bid meeting and site visit has been scheduled for 3:00 PM on Tuesday, November 26, 2019 at: Thomas M. Peirce School 2300 West Cambria Street Philadelphia, PA 19122 | Addendum1 Addendum2 | Various Schools | $1,000,000 | Bid Results |
11/04 | 12/10/19 | B-048 C of 2018/19 | Electrical | Relight A pre-bid conference and site tour will be held at the project location, on Thursday, November 21, 2019 at 10:00 A.M. Walkthrough Attendance | Bayard Taylor School | $672,445 | Bid Results | |
11/01 | 12/10/19 | B-046 C of 2017/18 | General | Roof Replacement A pre-bid conference and site tour will be held at the project location, on Thursday, November 14, 2019 at 10:00 A.M. Walkthrough Attendance | Addendum1 Addendum2 | Thomas Creighton Elementary School | $1,154,176 | Bid Results |
10/28 | 12/17/19 | B-018 C of 2018/19 | Electrical | Electrical Upgrades A pre-bid conference and site tour will be held at the project location, on Thursday, November 14, 2019 at 10:00 A.M. Walkthrough Attendance | Addendum1 Addendum2 | Edwin Stanton Elementary School | $1,996,527 | Bid Results |
10/25 | 01/16/20 | B-147 C of 2017/18 | General | HVAC Replacement A pre-bid conference and site tour will be held at the project location, on Tuesday, November 12, 2019 at 10:00 A.M. Walkthrough Attendance | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Cook Wissahickon Elementary School | $566,428 | Bid Results |
B-148 C of 2017/18 | Mechanical | $3,023,499 | Bid Results | |||||
B-150 C of 2017/18 | Plumbing | $1,361,839 | Bid Results | |||||
B-149 C of 2017/18 | Electrical | $866,029 | Bid Results | |||||
10/25 | 01/07/20 | B-111 C (R) of 2017/18 | General | Major Renovation and Addition A pre-bid conference and site tour will be held at the project location, on Friday, November 8, 2019 at 2:00 P.M. Walkthrough Attendance | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 Addendum6 Addendum7 Addendum8 Addendum9 Addendum10 | Richmond Elementary School | $6,818,441 | Bid Results |
B-112 C of 2017/18 | Mechanical | $2,223,165 | Bid Results | |||||
B-113 C of 2017/18 | Plumbing | $594,809 | Bid Results | |||||
B-114 C of 2017/18 | Electrical | $2,572,564 | Bid Results | |||||
09/20 | 10/22/19 | B-072 C of 2017/18 | General | Roof Replacement A pre-bid conference and site tour will be held at the project location, on Thursday, October 10, 2019 at 10:00 A.M. | Addendum1 | Laura H. Carnell Elementary School | $1,257,585 | Bid Results |
09/20 | 10/22/19 | B-054 C of 2018/19 | General | Building Façade Structural Repairs A pre-bid conference and site tour will be held at the project location, on Tuesday, October 1, 2019 at 11:00 A.M. | Addendum1 | James Dobson Elementary School | $578,016 | Bid Results |
09/20 | 10/22/19 | B-055 C of 2018/19 | Electrical | Generator Replacement A pre-bid conference and site tour will be held at the project location, on Thursday, September 26, 2019 at 11:00 A.M. | Addendum1 Addendum2 | William Rowen Elementary School | $175,957 | Bid Results |
09/11 | 12/31/19 | B-002 G-X OF 2018/19 | RFQ | RFQ: Paint & Plaster Repairs Rolling Submissions Sample Contract Part 1 Sample Contract Part 2 | ||||
08/26 | 10/08/19 | B-044 C of 2017/18 | Electrical | Electrical Upgrades A pre-bid conference and site tour will be held at the project location, on Tuesday, September 17, 2019 at 10:00 A.M. | Addendum1 Addendum2 Addendum3 | Vare-Washington Elementary | $1,699,170 | Bid Results |
08/23 | 09/24/19 | B-036 C of 2018/19 | Electrical | Generator Replacement A pre-bid conference and site tour will be held at the project location, on Tuesday, September 10, 2019 at 10:00 A.M. | Addendum1 Addendum2 Addendum3 | Camelot Academy School | $111,990 | Bid Results |
07/11/19 | 07/30/19 | RFP-071019 Sample Contract | Professional Services | Educational Specifications, Design Guidelines & Standards | Addendum1 Addendum2 | SDP | ||
06/27 | 07/11/19 | B-121 C (R) of 2017/18 | Mechanical | CTE Improvements | Addendum1 Addendum2 Addendum3 | Swenson Arts & Technology High School | $405,870 | Bid Results |
05/31 | 06/18/19 | B-046 C of 2018/19 | Electrical | Generator Replacement A pre-bid conference and site tour will be held at the project location, on Tuesday, June 4, 2019 at 10:00 A.M. | Julia Ward Howe Elementary School | $115,750 | Bid Results | |
05/17 | 06/25/19 | B-120 C of 2017/18 | General | CTE Improvements A pre-bid conference and site tour will be held at the project location, on Thursday, May 30, 2019 at 11:00 AM. Walkthrough Attendance | Addendum1 Addendum2 Addendum3 | Swenson Arts & Technology High School | $1,165,605 | Bid Results |
B-121 C of 2017/18 | Mechanical | CTE Improvements | $405,870 | Please refer to B-121 C (R) of 2017/18 | ||||
B-123 C of 2017/18 | Electrical | CTE Improvements | $400,872 | Bid Results | ||||
05/14 | 06/18/19 | B-083 C of 2017/18 | General | Window Replacement A pre-bid conference and site tour will be held at the project location, on Wednesday, June 5, 2019 at 10:00 A.M. Walkthrough Sign In Sheet | Addendum1 Addendum2 Addendum3 Addendum4 | Potter Thomas Elementary School | $728,427 | Bid Results |
04/15 | 04/30/19 | B-070 C | General | Commons Renovation | Addendum1 | Carver Engineering & Science | $303,340 | Bid Results |
B-071 C | Electrical | $49,527 | Bid Results | |||||
04/11 | 05/07/19 | B-124 C of 2017/18 | General | Science Lab Renovation Walkthrough Attendance | Addendum1 | Girard Academic Music Program | $444,654 | Bid Results |
B-125 C of 2017/18 | Electrical | $136,228 | Bid Results | |||||
B-126 C of 2017/18 | Mechanical | $143,362 | Bid Results | |||||
B-127 C of 2017/18 | Plumbing | $196,336 | Bid Results | |||||
04/09 | 05/21/19 | B-108 C of 2017/18 | General | Boiler Plant Replacement Walkthrough Attendance | Addendum1 Addendum2 Addendum3 | Mastbaum Vocational Tech High School | $308,760 | Bid Results |
B-109 C of 2017/18 | Mechanical | $2,191,263 | Bid Results | |||||
B-110 C of 2017/18 | Electrical | $412,672 | Bid Results | |||||
04/05 | 04/30/19 | B-019 C of 2018/19 | General | Classroom Modernization Walkthrough Attendance | Addendum1 | James J. Sullivan Elementary School | $956,754 | Bid Results |
B-020 C of 2018/19 | Electrical | Classroom Modernization | $624,118 | Bid Results | ||||
04/01 | 05/7/19 | B-052 C of 2017/18 | Electrical | Electrical Upgrades | Addendum1 Addendum2 | Meredith William M. Elementary School | $1,635,478 | Bid Results |
04/01 | 04/30/19 | B-134 C of 2017/18 | General | Science Lab Modernization Walkthrough Attendance | Addendum1 | Conwell Middle School | $452,867 | Bid Results |
B-135 C of 2017/18 | Plumbing | Science Lab Modernization | $133,541 | Bid Results | ||||
B-136 C of 2017/18 | Electrical | Science Lab Modernization | $153,355 | Bid Results | ||||
04/01 | 05/07/19 | B-138 C of 2017/18 | General | CTE Improvements Walkthrough Attendance | Addendum1 Addendum2 | Randolph Career and Technical High School | $642,353 | Bid Results |
05/07/19 | B-139 C of 2017/18 | Mechanical | CTE Improvements | $630,275 | Bid Results | |||
05/07/19 | B-140 C of 2017/18 | Plumbing | CTE Improvements | $140,324 | Bid Results | |||
05/07/19 | B-141 C of 2017/18 | Electrical | CTE Improvements | $581,576 | Bid Results | |||
03/29 | 04/30/19 | B-005 C of 2018/19 | General | New Exterior ADA Accessible Ramp & Stair Walkthrough Attendance | William Cramp School | $205,530 | Bid Results | |
03/19 | 05/02/19 | B-128 C of 2017/18 | General | Major Renovations Walkthrough Attendance | Addendum1 Addendum2 Addendum3 | Andrew Hamilton School | $4,129,057 | Bid Results |
B-129 C of 2017/18 | Mechanical | Major Renovations | $2,065,911 | Bid Results | ||||
B-130 C of 2017/18 | Plumbing | Major Renovations | $217,198 | Bid Results | ||||
B-131 C of 2017/18 | Electrical | Major Renovations | $2,173,918 | Bid Results | ||||
03/14 | 04/02/19 | B-132C of 2018/19 | General | Classroom Modernization | Addendum1 | Charles W. Henry School | $1,343,825 | Bid Results |
B-133C of 2018/19 | Electrical | Classroom Modernization | $344,549 | Bid Results | ||||
03/18 | 04/09/19 | B-091C of 2017/18 | Mechanical | Mechanical Plant Replacement | Addendum1 Addendum2 | James G. Blaine School | $1,045,081 | Bid Results |
B-092C of 2017/18 | Electrical | Mechanical Plant Replacement | $105,952 | Bid Results | ||||
03/08 | 04/02/19 | B-068 C of 2017/18 | Mechanical | Chiller/Cooling Tower Replacement | Addendum1 Addendum2 Addendum3 | Bethune | $694,780 | Bid Results |
B-069 C of 2017/18 | Electrical | Chiller/Cooling Tower Replacement | $202,147 | Bid Results | ||||
02/28 | 03/19/19 | B-105 C of 2017/18 | Electrical | Relighting | Bodine High School | $586,452 | Bid Results | |
02/07 | 03/05/19 | B-024 C of 2018/19 | General | Classroom Modernization | Addendum1 | Munoz-Marin | $820,384 | Bid Results |
B-025 C of 2018/19 | Electrical | Classroom Modernization | $510,669 | Bid Results | ||||
02/07 | 03/05/19 | B-029 C of 2018/19 | General | Classroom Modernization Walkthrough Attendance | Addendum1 | Emlen | $642,500 | Bid Results |
B-030 C of 2018/19 | Electrical | Classroom Modernization | $336,391 | Bid Results | ||||
02/07 | 03/05/19 | B-021 C of 2018/19 | General | Classroom Modernization Walkthrough Attendance | Addendum1 | Potter Thomas | $927,935 | Bid Results |
B-022 C of 2018/19 | Plumbing | Classroom Modernization | $87,008 | Bid Results | ||||
B-023 C of 2018/19 | Electrical | Classroom Modernization | $455,316 | Bid Results | ||||
02/07 | 03/05/19 | B-026 C of 2018/19 | General | Classroom Modernization Walkthrough Attendance | Addendum1 | Ethel Allen | $785,754 | Bid Results |
B-027 C of 2018/19 | Plumbing | Classroom Modernization | $61,522 | Bid Results | ||||
B-028 C of 2018/19 | Electrical | Classroom Modernization | $395,416 | Bid Results | ||||
02/07 | 03/05/19 | B-031 C of 2018/19 | General | Classroom Modernization Walkthrough Attendance | Addendum1 | Edmonds | $1,184,442 | Bid Results |
B-032 C of 2018/19 | Plumbing | Classroom Modernization | $69,415 | Bid Results | ||||
B-033 C of 2018/19 | Electrical | Classroom Modernization | $687,495 | Bid Results | ||||
02/07 | 03/05/19 | B-034 C of 2018/19 | General | Classroom Modernization Walkthrough Attendance | Addendum1 Addendum2 Addendum3 | Dunbar | $504,472 | Bid Results |
B-035 C of 2018/19 | Electrical | Classroom Modernization | $364,930 | Bid Results | ||||
02/07 | 03/07/19 | B-043 C of 2018/19 | General | Classroom Modernization | Addendum1 | Morris | $634,959 | Bid Results |
B-044 C of 2018/19 | Electrical | Classroom Modernization | $361,411 | Bid Results | ||||
02/07 | 03/07/19 | B-037 C of 2018/19 | General | Classroom Modernization | Addendum1 | Mitchell | $886,602 | Bid Results |
B-038 C of 2018/19 | Electrical | Classroom Modernization | $405,606 | Bid Results | ||||
02/07 | 03/07/19 | B-041 C of 2018/19 | General | Classroom Modernization | Addendum1 | Bryant | $1,026,227 | Bid Results |
B-042 C of 2018/19 | Electrical | Classroom Modernization | $500,076 | Bid Results | ||||
02/07 | 03/07/19 | B-039 C of 2018/19 | General | Classroom Modernization | Addendum1 Addendum2 Addendum3 | Bache-Martin | $749,740 | Bid Results |
B-040 C of 2018/19 | Electrical | Classroom Modernization | $482,772 | Bid Results | ||||
01/29 | 03/05/19 | B-040 C of 2017/18 | Electrical | Electrical Upgrades | Addendum1 Addendum2 Addendum3 | Thomas K. Finletter Academics Plus School | $2,104,611 | Bid Results |
01/14 | 02/21/19 | B-106 C of 2017/18 | General | Structural Repairs and ADA Ramp | Addendum1 Addendum2 | Bodine High School 1101 N 4th St | $423,000 | Bid Results |
01/14 | 02/05/19 | B-104 C of 2017/18 | Electrical | Relighting | Addendum1 Addendum2 | Laura H. Carnell School 1100 Devereaux Ave | $981,457 | Bid Results |
12/19 | 02/01/19 | B-001 G-2 | RFQ | RFQ: Paint & Plaster Repairs Rolling Submissions | ||||
12/14 | 02/14/19 | B-025 C [R] of 2017/18 | General | Phase 1 Site Improvements Walkthrough Attendance | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 Addendum6 | Central High School 1700 West Olney Ave. | $6,183,978 | Bid Results |
B-026 C of 2017/18 | Electrical | $598,876 | Bid Results | |||||
12/14 | 01/15/19 | B-100 C of 2017/18 | General | Coal Storage Repair | William C. Bryant Elementary 6001 Cedar Ave. | $426,014 | Bid Results | |
11/20 | 12/18/18 | B-001 C of 2018/19 | General | Science Lab Renovation Walkthrough Attendance | Addendum1 | Philadelphia High School for Girls | $417,500 | Bid Results |
B-002 C of 2018/19 | Mechanical | $50,700 | Bid Results | |||||
B-003 C of 2018/19 | Plumbing | $177,200 | Bid Results | |||||
B-004 C of 2018/19 | Electrical | $198,000 | Bid Results | |||||
11/15 | 12/11/18 | B-089 C of 2016/17 | General | Paving & Stormwater Management | Addendum1 | Widener Memorial School | $1,292,702 | Bid Results |
10/04 | 11/06/18 | B-036 C of 2017/18 | General | Coal Storage & Wall Repairs | Addendum1 | Beeber High School | $678,029 | Bid Results |
09/21 | 10/25/18 | B-002 G of 2018/19 RFP | RFP | RFP: Paint and Plaster Repairs Sample Contract Part 1 Sample Contract Part 2 | Addendum1 Addendum2 | Awarded Firms | ||
09/18 | 10/16/18 | B-048 C of 2017/18 | Electrical | Relighting | Addendum1 | Spring Garden Elementary | $378,743 | Bid Results |
09/18 | 10/16/18 | B-064 C of 2017/18 | Electrical | Generator Replacement | Addendum1 | James Lowell School | $97,613 | Bid Results |
09/18 | 10/16/18 | B-061 C of 2017/18 | Electrical | Generator Replacement | Addendum1 | Paul Dunbar School | $97,653 | Bid Results |
09/13 | 10/16/18 | B-093 C of 2017/18 | General | Classroom Modernization Walkthrough Attendance | Addendum1 | Feltonville Intermediate | $693,947 | Bid Results |
10/16/18 | B-094 C of 2017/18 | Mechanical | $62,580 | Bid Results | ||||
10/16/18 | B-095 C of 2017/18 | Electrical | $283,242 | Bid Results | ||||
08/31 | 09/25/18 | B-057 C of 2017/18 | Electrical | Generator Replacement | Addendum1 | Edward Steel | $95,640 | Bid Results |
08/31 | 09/25/18 | B-060 C of 2017/18 | Electrical | Generator Replacement | Addendum1 | C.W. Henry | $92,090 | Bid Results |
08/31 | 09/25/18 | B-028 C of 2017/18 | Electrical | Relighting | Addendum1 | Marshall J. School | $525,790 | Bid Results |
08/30 | 09/27/18 | B-084 C of 2017/18 | General | Chiller Plant Replacement | Addendum1 | Edward Heston 1621 N. 54th St. | $86,428 | Bid Results |
09/27/18 | B-085 C of 2017/18 | Mechanical | $400,518 | Bid Results | ||||
09/27/18 | B-086 C of 2017/18 | Electrical | $48,692 | Bid Results | ||||
08/22 | 09/11/18 | B-056 C of 2017/18 | Electrical | Generator Replacement | John Kinsey | $113,856 | Bid Results | |
08/21 | 09/18/18 | B-087 C of 2016/17 | General | Paving & Stormwater Management | Addendum1 | E.W. Rhodes 2900 W Clearfield St. | $1,731,188 | Bid Results |
08/21 | 09/13/18 | B-053 C of 2017/18 | Electrical | Relighting | Addendum1 | Samuel Gompers 5701 Wynnefield Ave. | $777,355 | Bid Results |
08/20 | 09/11/18 | B-054 C of 2016/17 | Electrical | Generator Replacement | Addendum1 | John Wister | $89,800 | Bid Results |
08/06 | 08/28/18 | B-079 C of 2017/18 | Electrical | Relighting | Addendum1 Addendum2 | AMY at James Martin 3380 Richmond St | $1,297,860 | Bid Results |
08/06 | 08/28/18 | B-053 C of 2016/17 | Electrical | Generator Replacement | Addendum1 | Harrington ES 5300 Baltimore Ave | $93,463 | Bid Results |
08/06 | 08/28/18 | B-052 C of 2016/17 | Electrical | Generator Replacement | Addendum1 | Bodine HS 1101 N 4th St | $95,846 | Bid Results |
07/17 | 08/28/18 | B-080 C of 2017/18 | General | Cooling Plant Replacement | Addendum1 Addendum2 | Edison HS 151 W Luzerne St | $315,398 | Bid Results |
07/17 | 08/28/18 | B-081 C of 2017/18 | Mechanical | $1,647,668 | Bid Results | |||
07/17 | 08/28/18 | B-082 C of 2017/18 | Electrical | $427,924 | Bid Results | |||
07/12 | 07/24/18 | B-006 C of 2018/19 | General | Asbestos Abatement & Enviro. Clean-Up A pre-bid conference and site tour will be scheduled. | Various Schools | $600,000 | Bid Results | |
07/03 | 08/28/18 | B-075 C of 2017/18 | General | New Construction Drawings 1 Drawings 2 Addendum 3 Drawings Sign-In Sheet | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Solis Cohen ES 7001 Horrocks St. | $33,574,550 | Bid Results |
07/03 | 08/28/18 | B-076 C of 2017/18 | Mechanical | $6,000,000 | Bid Results | |||
07/03 | 08/28/18 | B-077 C of 2017/18 | Plumbing | $2,610,000 | Bid Results | |||
07/03 | 08/28/18 | B-078 C of 2017/18 | Electrical | $4,450,000 | Bid Results | |||
06/19 | 07/11/18 | B-019 C (R) of 2017/18 | Electrical | *RE-BID* Renovation & Improvements | Addendum1 Addendum2 Addendum3 Addendum4 Addendum5 | Ben Franklin HS 550 N. Broad St. | $5,270,000 | Bid Results |
06/18 | 07/03/18 | B-001 G of 2018/19 | General | Paint and Plaster Work | Addendum1 | Various Schools | $7,500,000 | Bid Results |
06/07 | 07/12/18 | B-045 C of 2017/18 | Mechanical | HVAC System Improvements | Addendum1 | Benjamin Rush MS 11081 Knights Rd. | $514,500 | Bid Results |
05/22 | 06/15/18 | B-018 C of 2017/18 | General | Renovation & Improvements Sign-In Sheet 1 Sign-In Sheet 2 | Addendum1 | Ben Franklin HS 550 N. Broad St. | $12,845,000 | Bid Results |
05/22 | 06/15/18 | B-020 C of 2017/18 | Mechanical | $3,545,000 | Bid Results | |||
05/22 | 06/15/18 | B-021 C of 2017/18 | Plumbing | $2,264,538 | Bid Results | |||
04/17 | 06/05/18 | B-121 C (R) of 2016/17 | Electrical | *RE-BID* Boiler Plant Replacement | Addendum1 Addendum2 | Adaire ES 1300 E. Palmer St. | $282,547 | Bid Results |
05/14/18 | GSC-013 | Procurement | Pipe Insulation | $25,000 | ||||
05/14/18 | GSC-012 | Procurement | On-Call Piping Repairs | $25,000 | ||||
05/14/18 | GSC-011 | Procurement | Boiler Burner Service | $25,000 | ||||
04/20 | 05/14/18 | B-071 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum1 Addendum2 | Childs ES 1599 Wharton St. | $516,214 | Bid Results |
04/20 | 05/14/18 | B-074 C of 2017/18 | Electrical | $319,048 | Bid Results | |||
04/20 | 05/14/18 | B-041 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum1 Addendum2 | McMichael ES 3543 Fairmount Ave. | $547,117 | Bid Results |
04/20 | 05/14/18 | B-043 C of 2017/18 | Electrical | $338,939 | Bid Results | |||
04/20 | 05/14/18 | B-033 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum1 Addendum2 | Rhoads ES 4901 Parrish St. | $682,816 | Bid Results |
04/20 | 05/14/18 | B-035 C of 2017/18 | Electrical | $393,697 | Bid Results | |||
04/20 | 05/14/18 | B-067 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum1 Addendum2 | Steel ES 4301 Wayne Ave. | $1,058,119 | Bid Results |
04/20 | 05/14/18 | B-070 C of 2017/18 | Electrical | $336,953 | Bid Results | |||
04/20 | 05/14/18 | B-063 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum1 Addendum2 | Rowen ES 6841 North 19th St. | $646,623 | Bid Results |
04/20 | 05/14/18 | B-066 C of 2017/18 | Electrical | $361,800 | Bid Results | |||
04/20 | 05/14/18 | B-059 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum 1 Addendum 2 | A. B. Day ES 6324 Crittenden St. | $420,416 | Bid Results |
04/20 | 05/14/18 | B-062 C of 2017/18 | Electrical | $414,330 | Bid Results | |||
04/20 | 05/14/18 | B-037 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum 1 Addendum 2 | J. H. Brown ES 3600 Stanwood St. | $678,406 | Bid Results |
04/20 | 05/14/18 | B-039 C of 2017/18 | Electrical | $388,640 | Bid Results | |||
04/20 | 05/14/18 | B-029 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum 1 Addendum 2 | Farrell ES 8300 Castor Ave. | $397,305 | Bid Results |
04/20 | 05/14/18 | B-031 C of 2017/18 | Electrical | $168,733 | Bid Results | |||
04/20 | 05/14/18 | B-047 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum 1 Addendum 2 | Taggart ES 3698 N. Randolph St. | $732,204 | Bid Results |
04/20 | 05/14/18 | B-050 C of 2017/18 | Electrical | $184,541 | Bid Results | |||
04/20 | 05/14/18 | B-055 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum 1 Addendum 2 | Hunter ES 2400 N. Front St. | $198,912 | Bid Results |
04/20 | 05/14/18 | B-058 C of 2017/18 | Electrical | $235,105 | Bid Results | |||
04/20 | 05/14/18 | B-051 C of 2017/18 | General | Classroom Modernization Sign-In Sheet | Addendum 1 Addendum 2 | Webster ES 3400 Frankford Ave. | $1,121,070 | Bid Results |
04/20 | 05/14/18 | B-054 C of 2017/18 | Electrical | $502,123 | Bid Results | |||
04/16 | 05/08/18 | B-003C 2017/18 | General | ATC Replacement | Addendum 1 | JB Kelly ES 5116 Pulaski Ave. | $142,274 | Bid Results |
04/16 | 05/08/18 | B-004C 2017/18 | Mechanical | $2,154,177 | Bid Results | |||
04/16 | 05/08/18 | B-024C 2017/18 | Electrical | $176,884 | Bid Results | |||
04/11 | 05/08/18 | B-086 C of 2016/17 | General | Paving and Stormwater Management | Addendum 1 | Hill Freedman Academy @ Leeds Campus | $1,504,911 | Bid Results |
04/05 | 05/01/18 | B-088 C of 2016/17 | General | Paving and Stormwater Management | Addendum 1 | Rowen ES 6841 N. 19th St. | $528,966 | Bid Results |
04/05 | 05/08/18 | B-119 C of 2016/17 | General | Boiler Plant Replacement | Addendum1 | Adaire ES 1300 E. Palmer St. | $92,218 | Bid Results |
04/05 | 05/08/18 | B-120 C of 2016/17 | Mechanical | $2,477,967 | Bid Results | |||
04/05 | 05/08/18 | B-121 C of 2016/17 | Electrical | $282,547 | Plan Holders | |||
03/28 | 05/01/18 | B-011 C of 2017/18 | General | New Livestock Center | Addendum 1 Addendum 2 | W.B. Saul HS 7100 Henry Ave. | $550,700 | Bid Results |
03/28 | 05/01/18 | B-012 C of 2017/18 | Plumbing | $128,700 | Bid Results | |||
03/28 | 05/01/18 | B-013 C of 2017/18 | Electrical | $200,800 | Bid Results | |||
03/28 | 04/24/18 | B-085 C of 2016/17 | General | Paving & Stormwater Management | Addendum 1 Addendum 2 | Lankenau HS 201 Spring Ln. | $535,225 | Bid Results |
03/28 | 05/08/18 | GSC-008 | Procurement | Plumbing Services | $25,000 | |||
03/26 | 05/01/18 | B-122 C of 2017/18 | General | Mechanical Plant Replacement | Addendum 1 Addendum 2 | Stanton ES 901 S. 17th St. | $99,258 | Bid Results |
03/26 | 05/01/18 | B-123 C of 2017/18 | Mechanical | $1,479,596 | Bid Results | |||
03/26 | 05/01/18 | B-124 C of 2017/18 | Electrical | $204,733 | Bid Results | |||
03/08 | 04/26/18 | B-804 C of 2016/17 | General | Major Renovations | Addendum 1 Addendum 2 | Wilson MS 1800 Cottman Ave. | $7,260,332 | Bid Results Sign-In Sheet |
03/08 | 04/26/18 | B-805 C of 2016/16 | Mechanical | $2,936,210 | Bid Results | |||
03/08 | 04/26/18 | B-806 C of 2016/17 | Plumbing | $255,088 | Bid Results | |||
03/08 | 04/26/18 | B-807 C of 2016/17 | Electrical | $4,221,144 | Bid Results | |||
03/01 | 04/03/18 | B-002 C of 2017/18 | General | Retaining Wall Structural Repair | Addendum 1 Addendum 2 | Pollock ES 2875 Welsh Rd. | $826,747 | Bid Results |
02/26 | 04/03/18 | B-014 C of 2017/18 | General | Major Renovations | Addendum 1 Addendum 2A Addendum 2B Addendum 3 | Motivation HS 5900 Baltimore Ave. | $11,089,163 | Bid Results |
02/26 | 04/03/18 | B-015 C of 2017/18 | Mechanical | $3,442,546 | Bid Results | |||
02/26 | 04/03/18 | B-016 C of 2017/18 | Plumbing | $266,960 | Bid Results | |||
02/26 | 04/03/18 | B-017 C of 2017/18 | Electrical | $2,841,156 | Bid Results | |||
02/22 | 04/05/18 | B-800 C of 2016/17 | General | Major Renovations | Addendum 1 Addendum 2 Addendum 3 Addendum 4 | Roosevelt ES 430 E. Washington Ln. | $5,779,149 | Bid Results |
02/22 | 04/05/18 | B-801 C of 2016/17 | Mechanical | $154,166 | Bid Results | |||
02/22 | 04/05/18 | B-802 C of 2016/17 | Plumbing | $56,212 | Bid Results | |||
02/22 | 04/05/18 | B-803 C of 2016/17 | Electrical | $1,259,103 | Bid Results | |||
02/22 | 03/13/18 | B-022 C of 2017/18 | General | Asbestos Abatement | Addendum 1 | Motivation/Kipp School, 5900 Baltimore Ave. | $400,000 | Bid Results Plan Holders |
03/06/18 | GSC-005 | Procurement | Boiler Burner Service | $25,000 | ||||
02/14 | 03/13/18 | B-104C of 2016/17 | Electrical | Generator Replacement | Addendum 1 | Lewis Elkin ES, 3199 D St. | $90,734 | Bid Results Plan Holders |
02/14 | 03/06/18 | GSC-006 | Procurement | On-Call Piping Services | $25,000 | |||
01/31 | 02/27/18 | B-056C of 2016/17 | General | Roof Replacement | Addendum 1 | Watson Comly ES, 1001 Byberry Rd. | $1,510,733 | Bid Results |
02/14/18 | GSC-002 | Procurement | Fire Sprinkler Repair | $25,000 | ||||
02/14/18 | GSC-001 | Procurement | Electrical Equipment | $25,000 | ||||
01/30 | 02/22/18 | B-005C of 2017/18 | General | HVAC Renovations | Addendum 1 | Munoz Marin ES, 3300 N. 3rd St. | $99,214 | Bid Results |
01/30 | 02/22/18 | B-006C of 2017/18 | Mechanical | $3,250,970 | Bid Results | |||
01/30 | 02/22/18 | B-007C of 2017/18 | Electrical | $425,318 | Bid Results | |||
02/13/18 | GSC-004 | Procurement | Plumbing Services | $25,000 | ||||
02/13/18 | GSC-003 | Procurement | Pipe Insulation | $25,000 | ||||
01/18 | 02/06/18 | B-009C of 2017/18 | Electrical | Fire Alarm Replacement | Addendum 1 | Morrison ES, 5100 N. 3rd St. | $407,770 | Bid Results |
01/12 | 02/27/18 | B-810C of 2016/17 | Electrical | Major Renovations | Addendum 1 | Greenfield ES, 2200 Chestnut St. | $886,388 | Bid Results |
01/12 | 02/27/18 | B-809C of 2016/17 | Mechanical | $2,891,777 | Bid Results | |||
01/12 | 02/27/18 | B-808C of 2016/17 | General | $1,009,605 | Bid Results | |||
01/12 | 02/13/18 | B-008C of 2017/18 | Electrical | Fire Alarm Replacement | Addendum 1 | Forrest ES, 7300 Cottage St. | $289,700 | Bid Results |
12/29 | 01/30/18 | B-057 C of 2016/17 | General | Roof Replacement | Addendum 1 | W. F. Harrity ES, 5601 Christian St. | $895,173 | Bid Results |
12/29 | 01/23/18 | B-103C of 2016/17 | Electrical | Emergency Generator Replacement | Hampton Moore ES, 6900 Summerdale Ave. | $93,916 | Bid Results | |
12/21 | 01/30/18 | B-001C of 2017/18 | Electrical | Fire Alarm Replacement | Addendum 1 Addendum 2 | Joseph Pennell ES, 1800 Nedro Ave. | $289,552 | Bid Results |
12/12 | 01/23/18 | B-065C of 2016/17 | General | Roof Replacement | Addendum 1 Attachments | Andrew Hamilton ES, 5640 Spruce St. | $1,232,427 | Bid Results |
10/26 | 11/28/17 | B-063 C of 2016/17 | General | Roof Replacement | Addendum 1 | George Sharswood ES, 2300 S. 2nd St. | $1,487,791 | Bid Results |
10/26 | 12/05/17 | B-059 C of 2016/17 | General | Roof Replacement | Addendum 1 | Thurgood Marshall, 5120 N. 6th St. | $929,436 | Bid Results |
10/25 | 11/21/17 | B-010 C of 2017/18 | General | Structural Repairs | Addendum 1 | Leslie Pinkney Hill ES, 3133 Ridge Ave. | $199,000 | Bid Results |
10/20 | 11/14/17 | B-105 C of 2016/17 | Electrical | Generator Replacement | Roosevelt ES, 430 E. Washington Ln. | $99,000 | Bid Results | |
10/19 | 11/21/17 | B-058 C of 2016/17 | General | Roof Replacement | Addendum 1 | Kearny ES, 601 Fairmount Ave. | $630,974 | Bid Results |
10/04 | 11/14/17 | B-064 C of 2016/17 | General | Roof Replacement | Addendum 1 | Harrington ES, 5300 Baltimore Ave. | $1,174,412 | Bid Results |
11/14/17 | B-106 C of 2016/17 | Electrical | Fire Alarm Replacement | Hancock ES, 3700 Morrell Ave. | $244,188 | Bid Results | ||
11/14/17 | B-084 C of 2016/17 | Electrical | Major Renovation Phase 2 | Addendum 1 | Moore ES, 6900 Summerdale Ave. | $1,927,531 | Bid Results | |
11/14/17 | B-083 C of 2016/17 | General | $648,124 | Bid Results | ||||
11/07/17 | B-051 C of 2016/17 | Electrical | Fire Alarm Replacement | Lea ES, 4700 Locust St. | $313,930 | Bid Results | ||
10/03/17 | B-025 O of 2017/18 | General | Trailer Modernization and Relocation | Various Schools | $60,000 | Bid Results | ||
08/22/17 | B-017 C of 2016/17 | Electrical | Fire Alarm Replacement | Cooke ES, 1300 W. Louden St. | $465,900 | Bid Results | ||
09/19/17 | B-093C of 2016/17 | Electrical | New Addition | Addendum 1 | Farrell ES, 8300 Castor Rd. | $427,928 | Bid Results | |
09/19/17 | B-092C of 2016/17 | Plumbing | $405,977 | Bid Results | ||||
09/19/17 | B-091C of 2016/17 | Mechanical | $613,785 | Bid Results | ||||
09/19/17 | B-090C of 2016/17 | General | $4,224,247 | Bid Results | ||||
08/22/17 | B-110 C of 2016/17 | Electrical | HVAC Renovation | Rush ES, 11081 Knights Rd. | $161,303 | Bid Results | ||
08/22/17 | B-109 C of 2016/17 | Mechanical | $709,587 | Bid Results | ||||
08/22/17 | B-018 C of 2016/17 | Electrical | Fire Alarm Replacement | Prince Hall ES, 6101 N. Gratz St. | $261,230 | Bid Results | ||
08/15/17 | B-108 C of 2016/17 | Electrical | HVAC Renovation | Webster ES, 3400 Frankford Ave. | $238,775 | Bid Results | ||
08/15/17 | B-107 C of 2016/17 | Mechanical | $1,401,580 | Bid Results | ||||
08/15/17 | B-093 C of 2015/16 | General | Building Demolition | Old Fels HS, 1001 Devereaux Ave. | $3,000,000 | Bid Results | ||
08/01/17 | B-098 C of 2016/17 | Electrical | Fire Alarm Replacement | Taggart ES, 400 W. Porter St. | $294,514 | Bid Results | ||
08/01/17 | B-097 C of 2016/17 | Electrical | Fire Alarm Replacement | Morris ES, 2600 W. Thompson St. | $325,622 | Bid Results | ||
08/01/17 | B-019 C of 2016/17 | Electrical | Fire Alarm Replacement | Cook-Wissahickon ES, 531 Righter St. | $365,073 | Bid Results | ||
08/01/17 | B-055 C of 2016/17 | General | Roof Replacement | Brown ES, 1900 E. Sergeant St. | $1,323,828 | Bid Results | ||
08/01/17 | B-096 C of 2016/17 | Electrical | Major Renovation Phase 1 | Moore ES, 6900 Summerdale Ave. | $102,786 | Bid Results | ||
08/01/17 | B-095 C of 2016/17 | Plumbing | $53,666 | Bid Results | ||||
08/01/17 | B-094 C of 2016/17 | General | $5,595,041 | Bid Results | ||||
06/27/17 | B-062 C of 2016/17 | Electrical | Digital Media Lab Renovations | Overbrook HS, 5898 Lancaster Ave. | $188,842 | Bid Results | ||
06/27/17 | B-061 C of 2016/17 | Mechanical | $146,191 | Bid Results | ||||
06/27/17 | B-060 C of 2016/17 | General | $243,121 | Bid Results | ||||
06/27/17 | B-113 C of 2016/17 | Plumbing | Roof Replacement | Loesche ES, 595 Tomlinson Rd. | $173,124 | Bid Results | ||
06/27/17 | B-112 C of 2016/17 | Mechanical | $153,320 | Bid Results | ||||
06/27/17 | B-111 C of 2016/17 | General | $2,536,177 | Bid Results | ||||
06/27/17 | B-020 C of 2016/17 | Electrical | Fire Alarm Replacement | $376,703 | Bid Results | |||
06/20/17 | B-073 C of 2016/17 | Electrical | Fire Alarm Replacement | Hackett ES, 2161 E. York St. | $329,253 | Bid Results | ||
06/20/17 | B-006 C of 2016/17 | General | Asbestos Abatement | Various Schools | $600,000 | |||
06/27/17 | B-035 C of 2015/16 | Electrical | Fire Alarm Replacement | Edison HS, 151 W. Luzerne St. | $1,905,279 | Bid Results | ||
06/27/17 | B-034 C of 2015/16 | General | Elevator Alterations | $761,818 | Bid Results | |||
06/06/17 | B-070 C of 2016/17 | Electrical | Fire Alarm Replacement | Bethune ES, 3301 Old York Road | $347,100 | Bid Results | ||
06/06/17 | B-013 C of 2016/17 | Electrical | Elevator Alterations | Elgin ES, 3199 D St. | $63,874 | Bid Results | ||
06/06/17 | B-012 C of 2015/16 | General | $232,090 | Bid Results | ||||
05/16/17 | B-101 C of 2016/17 | Electrical | Elevator Alterations | Kenderton ES, 1500 W. Ontario St. | $81,561 | Bid Results | ||
05/16/17 | B-100 C of 2016/17 | General | $332,058 | Bid Results | ||||
05/04/17 | B-024 C of 2016/17 | General | Roof Replacement | Rhoads ES, 4901 Parrish St. | $720,755 | Bid Results | ||
05/02/17 | B-028 C of 2016/17 | General | Roof Replacement | Dunbar ES, 1750 N. 12th St. | $1,226,753 | Bid Results | ||
05/02/17 | B-038 C of 2016/17 | Electrical | Classroom Modernization | Meade ES, 1600 N. 18th St. | $235,700 | Bid Results | ||
05/02/17 | B-037 C of 2016/17 | Plumbing | $28,390 | Bid Results | ||||
05/02/17 | B-036 C of 2016/17 | General | $462,000 | Bid Results | ||||
05/02/17 | B-032 C of 2016/17 | Electrical | Classroom Modernization | Duckery ES, 1501 W. Diamond St. | $237,290 | Bid Results | ||
05/02/17 | B-031 C of 2016/17 | Plumbing | $47,520 | Bid Results | ||||
05/02/17 | B-030 C of 2016/17 | General | $438,820 | Bid Results | ||||
04/25/17 | B-050 C of 2016/17 | Electrical | Classroom Modernization | Gideon ES, 2817 W. Glenwood Ave. | $176,261 | Bid Results | ||
04/25/17 | B-048 C of 2016/17 | General | $192,017 | Bid Results | ||||
04/25/17 | B-044 C of 2016/17 | Electrical | Classroom Modernization | Pennell ES, 1800 W. Nedro Ave. | $239,909 | Bid Results | ||
04/25/17 | B-042 C of 2016/17 | General | $372,755 | Bid Results | ||||
04/25/17 | B-041 C of 2016/17 | Electrical | Classroom Modernization | Stearne ES, 1655 Unity St. | $167,991 | Bid Results | ||
04/25/17 | B-040 C of 2016/17 | Plumbing | $29,367 | Bid Results | ||||
04/25/17 | B-039 C of 2016/17 | General | $345,954 | Bid Results | ||||
04/25/17 | B-035 C of 2016/17 | Electrical | Classroom Modernization | Locke ES, 4550 Haverford Ave. | $205,131 | Bid Results | ||
04/25/17 | B-034 C of 2016/17 | Plumbing | $27,833 | Bid Results | ||||
04/25/17 | B-033 C of 2016/17 | General | $348,044 | Bid Results | ||||
04/11/17 | B-047 C of 2016/17 | Electrical | Classroom Modernization | Lea ES, 4700 Locust St. | $191,504 | Bid Results | ||
04/11/17 | B-046 C of 2016/17 | Mechanical | $100,156 | Bid Results | ||||
04/11/17 | B-045 C of 2016/17 | General | $336,464 | Bid Results | ||||
04/06/17 | B-016 C of 2016/17 | Electrical | Boiler Replacement | Spring Garden ES, 1146 Melon St. | $100,316 | Bid Results | ||
04/06/17 | B-015 C of 2016/17 | Mechanical | $1,839,284 | Bid Results | ||||
04/04/17 | B-001 C of 2016/17 | General | Facade Restoration | Howe ES, 1301-31 W. Grange Ave. | $1,199,000 | Bid Results | ||
03/30/17 | B-010 C of 2016/17 | Electrical | Mechanical Plant Replacement | B.B. Comegys ES, 5100 Greenway Ave. | $436,763 | Bid Results | ||
03/30/17 | B-009 C of 2016/17 | Mechanical | $1,508,820 | Bid Results | ||||
04/04/17 | B-014 C of 2016/17 | Electrical | Science Lab Renovations | Parkway Center City, 540 N. 13th St. | $137,832 | Bid Results | ||
04/04/17 | B-013 C of 2016/17 | Plumbing | $172,676 | Bid Results | ||||
04/04/17 | B-012 C of 2016/17 | Mechanical | $53,750 | Bid Results | ||||
04/04/17 | B-011 C of 2016/17 | General | $469,778 | Bid Results | ||||
03/28/17 | B-072 C of 2016/17 | Electrical | Fire Alarm ReplacementFire Alarm Replacement | Taylor ES, 3630 N. Randolph St. | $128,451 | Bid Results | ||
03/28/17 | B-071 C of 2016/17 | Electrical | $274,210 | Bid Results | ||||
03/28/17 | B-027 C of 2016/17 | General | Exterior Door Replacement | Barney ES, 900 W. Lindley Ave. | $347,081 | Bid Results | ||
03/28/17 | B-025 C of 2016/17 | General | Exterior Door Replacement | Meredith ES, 725 S. 5th St. | $236,618 | Bid Results | ||
03/28/17 | B-005 C of 2016/17 | General | Loading Deck Repairs | Ben Franklin HS, 550 N. Broad St. | $280,000 | Bid Results | ||
03/09/17 | B-077 C of 2016/17 | Electrical | Chiller ReplacementChiller Replacement | Webster ES, 3400 Frankford Ave. | $104,270 | Bid Results | ||
03/09/17 | B-076 C of 2016/17 | Mechanical | $426,477 | Bid Results | ||||
03/07/17 | B-083 C of 2015/16 | Electrical | Fire Alarm Replacement | John Moffett ES, 127 W. Oxford St. | $233,350 | Bid Results | ||
02/21/17 | B-022 C of 2016/17 | General | Attic Asbestos Abatement | Dunbar ES, 1750 N. 12th St. | $400,000 | Bid Results | ||
02/21/17 | B-020 C [R] of 2015/16 | General | Underground Storage Tank Removal/Installation | Central HS, 1700 W. Olney Ave. | $275,000 | Bid Results | ||
02/14/17 | B-038 C of 2015/16 | General | Roof Replacement | William Bryant ES, 6001 Cedar Ave. | $1,709,055 | Bid Results | ||
02/14/17 | B-004 C of 2016/17 | General | Retaining Wall/Exterior Stair Reconstruction | Cassidy ES, 6523 Lansdowne Ave. | $282,635 | Bid Results | ||
02/07/17 | B-011 C of 2015/16 | General | Elevator Replacement | Cook-Wissahickon ES, 531 Righter St. | $315,438 | Bid Results | ||
02/02/17 | B-804 C of 2015/16 | Fire Protection | Major Renovations | Murrell Dobbins, 2150 W. Lehigh Ave. | $1,942,000 | Bid Results | ||
02/02/17 | B-803 C of 2015/16 | Electrical | $10,126,000 | Bid Results | ||||
02/02/17 | B-802 C of 2015/16 | Plumbing | $2,674,000 | Bid Results | ||||
02/02/17 | B-801 C of 2015/16 | Mechanical | $5,659,000 | Bid Results | ||||
02/02/17 | B-800 C of 2015/16 | General | $15,722,300 | Bid Results | ||||
01/05/17 | B-021 C of 2016/17 | General | Asbestos Abatement: Attic/Aud. Stage Area | Kinsey HS, 6501 Limekiln Pike | $225,000 | Bid Results | ||
01/10/17 | B-050 C of 2015/16 | General | Facade Restoration | Fitler ES, 140 W. Seymour St. | $870,601 | Bid Results | ||
01/03/17 | B-059 G of 2016/17 | Elevator | Elevator Repairs | Various Schools | $1,500,000 | Bid Results | ||
01/03/17 | B-055 G of 2016/17 | General | Roof Repairs | Various Schools | $1,500,000 | Bid Results | ||
01/03/17 | B-054 G of 2016/17 | General | Masonry Structural Repairs | Various Schools | $1,500,000 | Bid Results | ||
01/03/17 | B-052 G of 2016/17 | Electrical | Emergency Generator Repairs | Various Schools | $1,500,000 | Bid Results | ||
01/03/17 | B-050 G of 2016/17 | Electrical | Fire Alarm Repairs | Various Schools | $1,500,000 | Bid Results | ||
01/03/17 | B-049 G of 2016/17 | Mechanical | A/C Repairs Over 50 Tons | Various Schools | $1,500,000 | Bid Results | ||
01/03/17 | B-031 G of 2016/17 | Mechanical | ATC Service and Repairs | Various Schools | $1,500,000 | Bid Results | ||
01/03/17 | B-028 G of 2016/17 | Mechanical | Boiler/Refractory Repairs | Various Schools | $1,500,000 | Bid Results | ||
01/24/17 | B-012 G[R] of 2016/17 | Mechanical | Piping and Sewer Repairs | Various Schools | $1,500,000 | Bid Results | ||
01/03/17 | B-011 G of 2016/17 | Electrical | High Voltage Repairs | Various Schools | $1,500,000 | Bid Results | ||
01/24/17 | B-030 C of 2015/16 | Electrical | Fire Alarm Replacement | Richard Wright, 2700 W. Dauphin St. | $312,079 | Bid Results | ||
01/24/17 | B-009 C of 2015/16 | Electrical | Fire Alarm Replacement | Edward Heston ES, 1621 N. 54th St. | $333,022 | Bid Results | ||
Posted Date | Due Date | Specification # | Contract | Description | Addendum | Location | Budget | Results |
Ad
NOTICE: While addenda only appear in the General contract row of each project, they may apply to Electrical, Mechanical, and Plumbing contracts for the same project.